WELL · 42-477-30887 · DISTRICT 3

Barney Unit #2RE

N

Washington County · Navasota River (Cretaceous Lwr.) field  · Horizontal

Barney Unit #2RE (API 42-477-30887) is a horizontal well in Washington County operated by Enervest Operating L.L.C., completed May 5, 2001.

The RRC has issued 2 drilling permits between 2001 and 2007, permitted to 16,000 ft.

Completion filings report 4 formation tops, including Austin Chalk, Lower Cretaceous, Lwr Cretaceous, Georgetown.

No lease production has been reported under this well’s leases.

Operator of record

Enervest Operating L.L.C.

Houston, TX · P-5 Y, filed Oct 4, 2025 · 1,249 permits on file · (713) 659-3500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnervest Operating L.L.C.
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitEnervest Operating, L.L.C.Dec 28, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,000
total depth, ft
2
permits on file
Dec 28, 2007
last permit issued
May 5, 2001
completed
0
cumulative oil, bbl
3.12M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 5, 2001
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barney Unit G-3-238360Giddings (Austin Chalk, Gas)Magnolia Oil & Gas Operating LLC101.16MApr 2008 – Jul 2026
Barney Unit G-3-188056Navasota River (Cretaceous Lwr.)Enervest Operating, L.L.C.101.96MMay 2001 – Apr 2008

Gas, mcf lease total

Last 12 months 10,391 · prior 12 13,443(-23%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rme Petroleum CompanyMay 2001 → Nov 2002
  2. 2Anadarko E&P Company LPDec 2002 → Jul 2007
  3. 3Enervest Operating, L.L.C.Aug 2007 → Jul 2018
  4. 4Magnolia Oil & Gas Operating LLCAug 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
647865-99RecompletionEnervest Operating, L.L.C.Oct 16, 2007Dec 28, 2007Mar 13, 200816,000
503984-99DrillUnion Pacific Resources CompanyJan 12, 2001Jan 12, 2001Jan 28, 200116,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-188056————
—— G-3-238360————

Formation tops

As filed on W-2/G-1. Subsea from 360 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk13,115-12,755
Lower Cretaceous13,617-13,257
LWR Cretaceous13,617-13,257
Georgetown13,851-13,491

Perforations

Perforated and open-hole intervals.

FromToType
12,79017,448Perforated
13,16414,018Perforated
13,32714,003Perforated
13,91520,090Perforated
13,91520,090Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,53014.752,195 S
9.62513,16410.251,560 S
7.62513,9158.5200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 16, 2008Jun 19, 2008Yes
00Sep 5, 2008——
00May 30, 2002Mar 28, 2002Yes
00Apr 23, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47730887, documented in the API reference.