WELL · 42-479-31982 · DISTRICT 1

Briscoe -A- #530

N

Webb County  · Vertical

Briscoe -A- #530 (API 42-479-31982) is a permitted well in Webb County filed by Huber Energy L.P.; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 1978 and 2006, permitted to 5,568 ft.

Operator of record

Huber Energy L.P.

Houston, TX · P-5 Y, filed Feb 2, 2007 · 96 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSM Energy Companythrough May 2014
Latest permitHuber Energy L.P.Feb 21, 2006
5,568
total depth, ft
4
permits on file
Feb 21, 2006
last permit issued
—
completed
0
cumulative oil, bbl
42.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Briscoe -A- G-1-215189Catarina, SW. (Olmos)SM Energy Company1017.7KFeb 2006 – Mar 2016
Briscoe -A- G-1-78767Catarina, SW. (San Miguel-Gas)Huber Energy L.P.1025KJan 1993 – May 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pacific Operators, Inc.Jan 1993 → Feb 1999
  2. 2Pacific Operators of Texas, Inc.Mar 1999 → Feb 2000
  3. 3Crimson Energy Company, LCMar 2000 → Nov 2003
  4. 4Huber Energy L.P.Feb 2006 → Sep 2006
  5. 5Rockford Energy Partners II, LLCOct 2006 → Sep 2007
  6. 6St. Mary Land & Exploration Co.Oct 2007 → Jun 2010
  7. 7SM Energy CompanyJul 2010 → May 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
614053-99RecompletionHuber Energy L.P.Feb 13, 2006Feb 21, 2006—5,568
502379-98RecompletionCrimson Energy Company, LCNov 12, 2002Nov 28, 2000—5,568
502379-99RecompletionCrimson Energy Company, LCNov 28, 2000Nov 28, 2000—5,568
20729-99DrillGose, SteveMar 24, 1978Mar 24, 1978—5,568

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-78767————
—— G-1-215189————

Perforations

Perforated and open-hole intervals.

FromToType
4,7364,744Perforated
4,7564,766Perforated
5,1315,326Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62526712.25200 S
2.3755,027——
4.55,5437.8751,650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 29, 2006Mar 30, 2006Yes
00Apr 11, 2006——
00Jan 12, 1984Sep 14, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47931982, documented in the API reference.