WELL · 42-479-32368 · DISTRICT 4

Lessor Mary Etta #2

Plugged

Webb County · Big Cowboy (Wilcox 4800) field  · Vertical

Lessor Mary Etta #2 (API 42-479-32368) is a plugged well in Webb County, plugged April 5, 2004, last operated by Hng Oil Company.

The RRC has issued 3 drilling permits between 1979 and 1992, permitted to 5,300 ft.

It was permitted by Enron Oil & Gas Company and has since transferred to Hng Oil Company on the wellbore schedule.

Completion filings report 2 formation tops, including Queen City, Wilcox.

Its 4 leases have reported 13.6K barrels of oil and 405K mcf of gas since January 1993, last reporting in April 2004. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

HNG Oil Company

Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Mar 13, 1987 · 1,121 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHNG Oil Company
Production reportsConoco Inc.through Apr 2002
Latest permitEnron Oil & Gas CompanySep 2, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,300
total depth, ft
3
permits on file
Sep 2, 1992
last permit issued
Sep 11, 1980
completed
13.6K
cumulative oil, bbl
405K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 11, 1980
Shut in
—
Plugged
Apr 5, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lessor, Mary Etta G-4-170712Big Cowboy (Wilcox 4800)Conocophillips Company1052.7KOct 1998 – Apr 2004
Lessor, Mary Etta O-4-12226Big Cowboy (Wilcox 4800)Conoco Inc.113.6K268KAug 1993 – Oct 1999
Lessor, Mary Etta G-4-142850Big Cowboy (Wilcox 4800)Enron Oil & Gas Company1084.5KJan 1993 – Oct 1993
— G-4-96258——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyJan 1993 → May 1995
  2. 2Conoco Inc.Jun 1995 → Apr 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
403080-99RecompletionEnron Oil & Gas CompanySep 2, 1992Sep 2, 1992Oct 14, 19925,100
138949-99RecompletionHNG Oil CompanyOct 29, 1981Oct 29, 1981—5,200
48917-99DrillHNG Oil CompanyMay 21, 1979May 21, 1979—5,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-96258————
—— G-4-142850————
—— G-4-170712————
—— O-4-12226————

Formation tops

As filed on W-2/G-1. Subsea from 477 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City2,455-1,978
Wilcox4,460-3,983

Perforations

Perforated and open-hole intervals.

FromToType
4,4844,489Perforated
4,7704,774Perforated
4,9834,990Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,03512.25410 S
2.3754,436——
2.3754,683——
2.8755,0964.5215 S
2.8755,0974.5215 S
4.55,1547.875570 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 13, 1998——
00Sep 29, 1993Jul 23, 1993—
00Aug 5, 1993——
00Dec 15, 1992Oct 29, 1992Yes
00Nov 12, 1992——
00Jan 12, 1984Sep 25, 1980—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47932368, documented in the API reference.