WELL · 42-479-33347 · DISTRICT 4

Lod Moglia #1

Y

Webb County · Guerra (10 000) field · Temp Abandoned  · Vertical

Lod Moglia #1 (API 42-479-33347) is a well in Webb County operated by Hilcorp Energy Company, completed July 14, 1989 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued May 24, 1982, permitted to 11,500 ft.

It was permitted by Aminoil USA,Inc, OP.-Tka,Non-OP. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Aminoil Usa,inc, Op.-Tka,non-Op.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2021
Latest permitAminoil Usa,inc, Op.-Tka,non-Op.May 24, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
1
permits on file
May 24, 1982
last permit issued
Jul 14, 1989
completed
0
cumulative oil, bbl
899K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 14, 1989
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lod Moglia G-4-105007Guerra (9800)Hilcorp Energy Company1033.5KJan 1993 – Jul 2026
Lod Moglia G-4-105008Guerra (10,000)Hilcorp Energy Company10866KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lobo Resources, Ltd.Jan 1993 → Mar 1994
  2. 2Lobo Energy, Inc.Apr 1994 → Jun 1994
  3. 3Lobo Operating, Inc.Jul 1994 → Mar 1996
  4. 4Prime Operating CompanyJun 1996 → Feb 1998
  5. 5Cliffwood Production Co.Mar 1998 → Feb 2001
  6. 6Ocean Energy, Inc.Mar 2001 → Aug 2003
  7. 7Devon Louisiana CorporationSep 2003 → Dec 2005
  8. 8Devon Energy Production Co, L.P.Jan 2006 → Jul 2014
  9. 9Linn Operating, Inc.Aug 2014 → Apr 2016
  10. 10Hilcorp Energy CompanyApr 2018 → Apr 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
161654-99DrillAminoil Usa,inc, Op.-Tka,non-Op.May 24, 1982May 24, 1982—11,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-105007————
—— G-4-105008————

Formation tops

As filed on W-2/G-1. Subsea from 788 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxWILCOX W11-A9,835-9,047
WilcoxWILCOX W11-B10,005-9,217
WilcoxWILCOX W12-A10,142-9,354
WilcoxWILCOX W12-C10,490-9,702
WilcoxWILCOX W13-A10,760-9,972
WilcoxWILCOX W13-B10,868-10,080
WilcoxWILCOX W13-C10,962-10,174

Perforations

Perforated and open-hole intervals.

FromToType
9,8389,866Perforated
10,01810,064Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,51217.5715 S
9.6257,99712.251,700 S
711,1698.5520 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 28, 1989Aug 1, 1989—
00Jan 12, 1984May 11, 1983Yes
00Jan 12, 1984Mar 11, 1983Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47933347, documented in the API reference.