WELL · 42-479-33687 · DISTRICT 4

Puig Gas Unit 2 #4

Plugged

Webb County · George Buck (4TH Hinnant) field  · Vertical

Puig Gas Unit 2 #4 (API 42-479-33687) is a plugged well in Webb County, plugged October 9, 2002, last operated by Riddle Engineering Corp..

The RRC has issued 3 drilling permits (amended once) between 1983 and 1994, permitted to 9,480 ft.

It was permitted by Mueller Engineering Corp. and has since transferred to Riddle Engineering Corp. on the wellbore schedule.

Completion filings report 9 formation tops, including 2nd Hinnant, Hinnant 2nd, Puig, Hinnant 4th.

Operator of record

Riddle Engineering Corp.

Permitted by Mueller Engineering Corp.; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed Oct 7, 2011 · 21 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRiddle Engineering Corp.
Production reportsRiddle Engineering Corp.through Sep 2002
Latest permitMueller Engineering Corp.Jul 11, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,480
total depth, ft
4
permits on file
Jul 11, 1994
last permit issued
Jul 24, 1984
completed
0
cumulative oil, bbl
208K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 24, 1984
Shut in
—
Plugged
Oct 9, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Puig Gas Unit 2 G-4-152908Davis,s. (8000)Riddle Engineering Corp.10208KJun 1994 – Mar 2004
Puig Gas Unit 2 G-4-111906George Buck (4TH Hinnant)Riddle Engineering Corp.100Jan 1993 – Oct 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mueller Engineering Corp.Jun 1994 → Feb 2002
  2. 2Riddle Engineering Corp.Mar 2002 → Sep 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
425037-98RecompletionMueller Engineering Corp.Nov 28, 1994Jul 11, 1994May 25, 19948,400
425037-99RecompletionMueller Engineering Corp.Jun 27, 1994Jul 11, 1994—9,456
247629-99RecompletionArco Oil & Gas Co.Jun 28, 1984Aug 8, 1984—9,480
209274-99DrillArco Oil & Gas Co.Jun 28, 1984Sep 1, 1983Sep 10, 19839,480

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-111906————
—— G-4-152908————

Formation tops

As filed on W-2/G-1. Subsea from 878 ft elevation.Download CSV →

FormationMD ftSubsea
2ND Hinnant8,098-7,220
Hinnant 2ND8,098-7,220
Puig8,470-7,592
Hinnant 4TH8,726-7,848
HINNANT4TH8,726-7,848
91009,104-8,226
9100'9,104-8,226
Hinnant 5TH9,104-8,226
Hinnant 6TH9,303-8,425

Perforations

Perforated and open-hole intervals.

FromToType
8,1058,109Perforated
8,1148,117Perforated
8,4778,481Perforated
8,7268,746Perforated
9,1049,219Perforated
9,3049,386Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,51713.75—
10.751,52014.751,085 S
7.6257,3939.75—
7.6257,3989.875620 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 12, 1995Oct 16, 1995—
00Apr 6, 1995Nov 2, 1994Yes
00Mar 6, 1995——
00Aug 28, 1984Aug 9, 1984—
00Aug 15, 1984Aug 9, 1984—
00Jun 15, 1984May 4, 1984—
00Feb 24, 1984May 4, 1984—
00Feb 6, 1984May 4, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47933687, documented in the API reference.