WELL · 42-479-34665 · DISTRICT 4
Hendrickson K #1
Webb County · Lane Dixon (5934) field · Vertical
Hendrickson K #1 (API 42-479-34665) is a plugged well in Webb County, plugged January 27, 1998, last operated by Hamilton J. R..
The RRC has issued 2 drilling permits between 1988 and 1993, permitted to 8,500 ft.
Completion filings report 4 formation tops, including Mirando, Top Mirando, Queen City, Wilcox.
Operator of record
Carrizo Spgs, TX · P-5 Y, filed Feb 4, 2026 · 58 permits on file · (830) 876-8667
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hamilton J. R. |
| Production reports | Hamilton, J. R.through May 1997 |
| Latest permit | Hamilton, J. R.Aug 19, 1993 |
- 8,500
- total depth, ft
- 2
- permits on file
- Aug 19, 1993
- last permit issued
- Jul 19, 1993
- completed
- 0
- cumulative oil, bbl
- 151K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 19, 1993
- Shut in
- —
- Plugged
- Jan 27, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hendrickson, K G-4-146403 | Lane Dixon (5934) | Hamilton, J. R. | 1 | 0 | 124K | Jul 1993 – Sep 2002 |
| Hendrickson, K. G-4-128728 | Lane Dixon (5810) | Hamilton, J. R. | 1 | 0 | 27.2K | Jan 1993 – Dec 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hamilton, J. R.Jan 1993 → May 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 414998-99 | Recompletion | Hamilton, J. R. | Aug 17, 1993 | Aug 19, 1993 | Jul 17, 1993 | 8,500 |
| 344932-99 | Drill | Hamilton, J. R. & Archer, J.R. | Apr 8, 1988 | Apr 11, 1988 | — | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-128728 | — | — | — | — |
| — | — G-4-146403 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 390 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Mirando | 1,380 | -990 |
| Top Mirando | 1,380 | -990 |
| Queen City | 3,740 | -3,350 |
| Queen CityTOP QUEEN CITY | 3,740 | -3,350 |
| WilcoxTOP WILCOX | 5,730 | -5,340 |
| Wilcox | 5,730 | -5,340 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,824 | 5,834 | Perforated |
| 5,934 | 5,936 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 820 | 12.25 | 452 S |
| 4.5 | 6,140 | 7.875 | 491 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 21, 1993 | Aug 16, 1993 | Yes |
| 00 | Sep 9, 1993 | — | — |
| 00 | Nov 22, 1988 | Oct 10, 1988 | Yes |
| 00 | Nov 1, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-34665 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-34665 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47934665, documented in the API reference.