WELL · 42-479-35563 · DISTRICT 4

Hein Luz A. Estate #8

Y

Webb County · LA Perla (Lobo Cons.) field · Temp Abandoned  · Vertical

Hein Luz A. Estate #8 (API 42-479-35563) is a well in Webb County operated by Arete Operating Company LLC, completed October 14, 1992 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued August 18, 1992, permitted to 11,900 ft.

It was permitted by Enron Oil & Gas Company and has since transferred to Arete Operating Company LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Wills Point.

No lease production has been reported under this well’s leases.

Operator of record

Arete Operating Company LLC

Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed May 4, 2026 · 10 permits on file · (210) 325-9383

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArete Operating Company LLC
Production reportsArete Operating Company, LLCthrough Mar 2026
Latest permitEnron Oil & Gas CompanyAug 18, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,900
total depth, ft
1
permits on file
Aug 18, 1992
last permit issued
Oct 14, 1992
completed
0
cumulative oil, bbl
4.3M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 14, 1992
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hein, Luz A. Estate G-4-142846LA Perla (Wilcox, Lower)Arete Operating Company, LLC104.3MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 1,319 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyJan 1993 → Mar 1998
  2. 2Michael Petroleum CorporationApr 1998 → Dec 2001
  3. 3Calpine Natural Gas CompanyJan 2002 → Apr 2002
  4. 4Calpine Natural Gas Company L.P.May 2002 → Jul 2002
  5. 5Calpine Natural Gas L.P.Aug 2002 → Dec 2005
  6. 6Rosetta Resources Operating LPJan 2006 → Mar 2012
  7. 7Pinpoint Energy Operating, LLCApr 2012 → Aug 2012
  8. 8Petropoint Energy Operating, LLCSep 2012 → Jul 2014
  9. 9White Oak Operating Company LLCAug 2014 → Jul 2020
  10. 10Arete Operating Company, LLCAug 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
402460-99DrillEnron Oil & Gas CompanyAug 18, 1992Aug 18, 1992Sep 16, 199211,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-142846————

Formation tops

As filed on W-2/G-1. Subsea from 402 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxTOP WILCOX4,543-4,141
WilcoxLOWER WILCOX6,406-6,004
Wills Point10,627-10,225

Perforations

Perforated and open-hole intervals.

FromToType
10,34610,392Perforated
10,41210,421Perforated
10,42110,443Perforated
10,44810,468Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,02012.25370 S
77,4478.751,010 S
2.87510,6776.25610 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 15, 1992Oct 28, 1992Yes
00Nov 12, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47935563, documented in the API reference.