WELL · 42-479-35567 · DISTRICT 4
Russell Winch #10
Webb County · Vertical
Russell Winch #10 (API 42-479-35567) is a permitted well in Webb County filed by Chroma Operating, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1992 and 2011, permitted to 9,500 ft.
Completion filings report 5 formation tops, including Queen City, Wilcox, Lobo Unconformity, Lobo 1.
Operator of record
Washington, DC · P-5 Y, filed Jun 3, 2016 · 42 permits on file · (202) 454-1135
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | White Oak Operating Company LLCthrough Sep 2019 |
| Latest permit | Chroma Operating, Inc.Jun 24, 2011 |
- 9,500
- total depth, ft
- 3
- permits on file
- Jun 24, 2011
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 2.9M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Russell-Winch G-4-143764 | Vaquillas Ranch (Lobo Cons.) | Arete Operating Company, LLC | 1 | 0 | 2.9M | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Conoco Inc.Jan 1993 → Oct 1998
- 2North Central Oil Corp.Nov 1998 → Dec 2005
- 3Pogo Producing CompanyJan 2006 → Mar 2007
- 4White Oak Operating Company LLCApr 2007 → Sep 2019
- 5Chroma Operating, Inc.May 2008 → Nov 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 713711-99 | Field transfer | Chroma Operating, Inc. | Apr 6, 2011 | Jun 24, 2011 | May 28, 2010 | 8,840 |
| 482388-99 | Recompletion | North Central Oil Corp. | Feb 1, 1999 | Feb 19, 1999 | — | 8,840 |
| 402644-99 | Drill | Conoco Inc. | Aug 24, 1992 | Aug 26, 1992 | Oct 8, 1992 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-143764 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 475 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 2,960 | -2,485 |
| Wilcox | 5,430 | -4,955 |
| Lobo Unconformity | 8,350 | -7,875 |
| Lobo Unconformity | 9,710 | -9,235 |
| Lobo 1 | 10,050 | -9,575 |
| Lobo 6 | 10,320 | -9,845 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,790 | 7,796 | Perforated |
| 7,814 | 7,820 | Perforated |
| 8,361 | 8,390 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 507 | 12.25 | 200 S |
| 7 | 7,877 | 8.75 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 16, 2011 | Mar 28, 2011 | — |
| 00 | Aug 5, 2010 | Jun 18, 2010 | — |
| 00 | Nov 10, 1993 | Aug 26, 1993 | Yes |
| 00 | Feb 10, 1993 | Dec 9, 1992 | Yes |
| 00 | Feb 4, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-35567 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-35567 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47935567, documented in the API reference.