WELL · 42-479-35875 · DISTRICT 4
Welhausen, J.R. #2
Webb County · Vertical
Welhausen, J.R. #2 (API 42-479-35875) is a permitted well in Webb County filed by Chroma Operating, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1993 and 2009, permitted to 10,700 ft.
Completion filings report 4 formation tops, including Lobo Unconformity, Lobo 1, Lobo 6, Wills Point.
Operator of record
Washington, DC · P-5 Y, filed Jun 3, 2016 · 42 permits on file · (202) 454-1135
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Arete Operating Company, LLCthrough Apr 2026 |
| Latest permit | Chroma Operating, Inc.Dec 17, 2009 |
- 10,700
- total depth, ft
- 2
- permits on file
- Dec 17, 2009
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 431K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Welhausen, J.R. G-4-146609 | Vaquillas Ranch (Lobo Cons.) | Arete Operating Company, LLC | 1 | 0 | 431K | Sep 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 6,305 · prior 12 8,978(-30%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Conoco Inc.Sep 1993 → Oct 1998
- 2North Central Oil Corp.Nov 1998 → Dec 2005
- 3Pogo Producing CompanyJan 2006 → Feb 2007
- 4White Oak Operating Company LLCApr 2007 → Sep 2019
- 5Chroma Operating, Inc.May 2008 → Nov 2014
- 6Arete Operating Company, LLCOct 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 688010-99 | Recompletion | Chroma Operating, Inc. | Nov 30, 2009 | Dec 17, 2009 | — | 9,605 |
| 414058-99 | Drill | Conoco Inc. | Jul 20, 1993 | Jul 21, 1993 | Jul 31, 1993 | 10,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-146609 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 504 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lobo Unconformity | 8,930 | -8,426 |
| Lobo 1 | 8,960 | -8,456 |
| Lobo 6 | 9,350 | -8,846 |
| Wills Point | 9,590 | -9,086 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,972 | 8,992 | Perforated |
| 9,366 | 9,376 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 532 | 12.25 | 250 S |
| 8.75 | 8,046 | 8.75 | 240 S |
| 2.875 | 9,668 | 6.125 | 365 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 27, 2010 | May 21, 2010 | — |
| 00 | Nov 5, 1993 | Sep 29, 1993 | Yes |
| 00 | Oct 4, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-35875 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-35875 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47935875, documented in the API reference.