WELL · 42-479-35912 · DISTRICT 4
V.L. Puig Gas Unit #2 #7
Webb County · Muy Malo (6TH Hinnant) field · Vertical
V.L. Puig Gas Unit #2 #7 (API 42-479-35912) is a plugged well in Webb County, plugged October 24, 2002, last operated by Mueller Engineering Corp..
The RRC has issued 3 drilling permits (amended once) between 1993 and 2000, permitted to 10,500 ft.
Completion filings report 4 formation tops, including Jackson, Yegua, Queen City, Wilcox.
Operator of record
Corpus Chrsti, TX · P-5 Y, filed May 11, 2001 · 236 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mueller Engineering Corp. |
| Production reports | Riddle Engineering Corp.through Oct 2002 |
| Latest permit | Mueller Engineering Corp.Dec 6, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 4
- permits on file
- Dec 6, 2000
- last permit issued
- Jan 3, 1994
- completed
- 0
- cumulative oil, bbl
- 714K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1993 THROUGH Mar 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 3, 1994
- Shut in
- —
- Plugged
- Oct 24, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| V. L. Puig Gas Unit 2 G-4-181032 | Davis (Hinnant 1ST, North) | Riddle Engineering Corp. | 1 | 0 | 29.3K | Nov 2000 – Mar 2004 |
| V. L. Puig Gas Unit 2 G-4-156135 | Muy Malo (4TH Hinnant) | Mueller Engineering Corp. | 1 | 0 | 504K | Sep 1995 – Apr 2001 |
| V.L. Puig Gas Unit #2 G-4-147597 | Muy Malo (6TH Hinnant) | Mueller Engineering Corp. | 1 | 0 | 181K | Dec 1993 – Feb 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mueller Engineering Corp.Jan 1994 → Feb 2002
- 2Riddle Engineering Corp.Mar 2002 → Oct 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 502043-99 | Recompletion | Mueller Engineering Corp. | Nov 16, 2000 | Dec 6, 2000 | Apr 11, 2000 | 8,005 |
| 440064-99 | Recompletion | Mueller Engineering Corp. | Sep 20, 1995 | Sep 27, 1995 | Sep 27, 1995 | 9,550 |
| 415432-98 | Drill | Mueller Engineering Corp. | Oct 13, 1993 | Sep 16, 1993 | Sep 21, 1993 | 10,500 |
| 415432-99 | Drill | Mueller Engineering Corp. | Aug 27, 1993 | Sep 16, 1993 | — | 9,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-147597 | — | — | — | — |
| — | — G-4-156135 | — | — | — | — |
| — | — G-4-181032 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 914 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Jackson | 1 | 913 |
| Yegua | 2,800 | -1,886 |
| Queen City | 4,600 | -3,686 |
| Wilcox | 6,900 | -5,986 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,902 | 7,910 | Perforated |
| 7,912 | 7,916 | Perforated |
| 7,924 | 7,931 | Perforated |
| 8,664 | 8,672 | Perforated |
| 9,774 | 9,778 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 675 | 14.75 | 455 S |
| 7.625 | 6,900 | 9.875 | 775 S |
| 4.5 | 10,112 | 6.75 | 465 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 7, 2001 | Feb 14, 2001 | Yes |
| 00 | Mar 7, 2001 | — | — |
| 00 | Jan 31, 1996 | Oct 9, 1995 | Yes |
| 00 | Dec 7, 1995 | — | — |
| 00 | Jun 9, 1994 | Mar 15, 1994 | — |
| 00 | Feb 24, 1994 | Jan 6, 1994 | Yes |
| 00 | Jan 7, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-35912 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-35912 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47935912, documented in the API reference.