WELL · 42-479-35912 · DISTRICT 4

V.L. Puig Gas Unit #2 #7

Plugged

Webb County · Muy Malo (6TH Hinnant) field  · Vertical

V.L. Puig Gas Unit #2 #7 (API 42-479-35912) is a plugged well in Webb County, plugged October 24, 2002, last operated by Mueller Engineering Corp..

The RRC has issued 3 drilling permits (amended once) between 1993 and 2000, permitted to 10,500 ft.

Completion filings report 4 formation tops, including Jackson, Yegua, Queen City, Wilcox.

Operator of record

Mueller Engineering Corp.

Corpus Chrsti, TX · P-5 Y, filed May 11, 2001 · 236 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMueller Engineering Corp.
Production reportsRiddle Engineering Corp.through Oct 2002
Latest permitMueller Engineering Corp.Dec 6, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
4
permits on file
Dec 6, 2000
last permit issued
Jan 3, 1994
completed
0
cumulative oil, bbl
714K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1993 THROUGH Mar 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 3, 1994
Shut in
—
Plugged
Oct 24, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
V. L. Puig Gas Unit 2 G-4-181032Davis (Hinnant 1ST, North)Riddle Engineering Corp.1029.3KNov 2000 – Mar 2004
V. L. Puig Gas Unit 2 G-4-156135Muy Malo (4TH Hinnant)Mueller Engineering Corp.10504KSep 1995 – Apr 2001
V.L. Puig Gas Unit #2 G-4-147597Muy Malo (6TH Hinnant)Mueller Engineering Corp.10181KDec 1993 – Feb 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mueller Engineering Corp.Jan 1994 → Feb 2002
  2. 2Riddle Engineering Corp.Mar 2002 → Oct 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
502043-99RecompletionMueller Engineering Corp.Nov 16, 2000Dec 6, 2000Apr 11, 20008,005
440064-99RecompletionMueller Engineering Corp.Sep 20, 1995Sep 27, 1995Sep 27, 19959,550
415432-98DrillMueller Engineering Corp.Oct 13, 1993Sep 16, 1993Sep 21, 199310,500
415432-99DrillMueller Engineering Corp.Aug 27, 1993Sep 16, 1993—9,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-147597————
—— G-4-156135————
—— G-4-181032————

Formation tops

As filed on W-2/G-1. Subsea from 914 ft elevation.Download CSV →

FormationMD ftSubsea
Jackson1913
Yegua2,800-1,886
Queen City4,600-3,686
Wilcox6,900-5,986

Perforations

Perforated and open-hole intervals.

FromToType
7,9027,910Perforated
7,9127,916Perforated
7,9247,931Perforated
8,6648,672Perforated
9,7749,778Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7567514.75455 S
7.6256,9009.875775 S
4.510,1126.75465 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 7, 2001Feb 14, 2001Yes
00Mar 7, 2001——
00Jan 31, 1996Oct 9, 1995Yes
00Dec 7, 1995——
00Jun 9, 1994Mar 15, 1994—
00Feb 24, 1994Jan 6, 1994Yes
00Jan 7, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47935912, documented in the API reference.