WELL · 42-479-36142 · DISTRICT 4
Frost Trust #6
Webb County · Shockacon (Wilcox 6700) field · Producing · Vertical
Frost Trust #6 (API 42-479-36142) is a well in Webb County operated by Proline Energy Resources Inc, completed October 23, 1994 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued July 15, 1994, permitted to 7,600 ft.
It was permitted by Austin Resources Corporation and has since transferred to Proline Energy Resources Inc on the wellbore schedule.
Completion filings report one formation top, including Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Austin Resources Corporation; the EWA schedule now lists a different operator.
Sugar Land, TX · P-5 Y, filed Jul 4, 2026 · (832) 930-4455
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Proline Energy Resources Inc |
| Production reports | Proline Energy Resources Incthrough Feb 2026 |
| Latest permit | Austin Resources CorporationJul 15, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,600
- total depth, ft
- 1
- permits on file
- Jul 15, 1994
- last permit issued
- Oct 23, 1994
- completed
- 0
- cumulative oil, bbl
- 205K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 23, 1994
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Frost Trust G-4-153706 | Shockacon (Wilcox 6700) | Proline Energy Resources Inc | 1 | 0 | 205K | Oct 1994 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1,349 · prior 12 3,056(-56%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Austin Resources CorporationOct 1994 → Jan 1999
- 2TNR Petroleum, Inc.Apr 1999 → Sep 1999
- 3D-Mil Production, Inc.Oct 1999 → Nov 2003
- 4Jetta Operating Company, Inc.Dec 2003 → Dec 2006
- 5McRae & Henry, LtdJan 2007 → Oct 2015
- 6Proline Energy Resources IncNov 2015 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 425940-99 | Drill | Austin Resources Corporation | Jul 15, 1994 | Jul 15, 1994 | Jul 28, 1994 | 7,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-153706 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 715 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 6,772 | -6,057 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,790 | 6,813 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 436 | 12.25 | 280 S |
| 4.5 | 7,600 | 7.875 | 565 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 19, 1995 | Apr 19, 1995 | Yes |
| 00 | Apr 28, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-36142 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-36142 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47936142, documented in the API reference.