WELL · 42-479-36567 · DISTRICT 4

Gonzalez Ruben #7

Plugged

Webb County · Berry R. Cox (Wx. 6TH Hinnant) field  · Directional

Gonzalez Ruben #7 (API 42-479-36567) is a plugged well in Webb County, plugged November 26, 2019, last operated by Hughes Dan A. Company L.P..

The RRC has issued 2 drilling permits (amended twice) between 1996 and 1998, permitted to 13,000 ft.

It was permitted by Tesoro E&P Company, L.P. and has since transferred to Hughes Dan A. Company L.P. on the wellbore schedule.

Completion filings report 2 formation tops, including Queen City, Wilcox.

Operator of record

Hughes Dan A. Company L.P.

Permitted by Tesoro E&P Company, L.P.; the EWA schedule now lists a different operator.

Beeville, TX · P-5 Y, filed Nov 4, 2025 · 207 permits on file · (361) 358-3752

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHughes Dan A. Company L.P.
Production reportsEex E&P Company, L.P.through Jan 2001
Latest permitTesoro E&P Company, L.P.May 14, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
4
permits on file
May 14, 1998
last permit issued
May 9, 1998
completed
0
cumulative oil, bbl
3.48M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1997 THROUGH Nov 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 9, 1998
Shut in
—
Plugged
Nov 26, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gonzalez, Ruben G-4-168161Berry R. Cox (Wx. 6TH Hinnant)Hughes, Dan A. Company, L.P.10350KMay 1998 – Nov 2019
Gonzalez, Ruben G-4-162616Berry R. Cox (Wilcox L-1)Tesoro E&P Company, L.P.103.13MJan 1997 – May 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tesoro E&P Company, L.P.Jan 1997 → Dec 1999
  2. 2Eex E&P Company, L.P.Feb 2000 → Jan 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
476260-99RecompletionTesoro E&P Company, L.P.May 14, 1998May 14, 1998May 8, 199812,400
452543-97DrillTesoro E&P Company, L.P.Feb 21, 1997Sep 11, 1996Oct 11, 199612,400
452543-98DrillTesoro E&P Company, L.P.Dec 17, 1996Sep 11, 1996—12,165
452543-99DrillTesoro E&P Company, L.P.Sep 11, 1996Sep 11, 1996—13,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-162616————
—— G-4-168161————

Formation tops

As filed on W-2/G-1. Subsea from 842 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City5,065-4,223
Wilcox8,900-8,058

Perforations

Perforated and open-hole intervals.

FromToType
11,58511,607Perforated
11,75011,774Perforated
11,91011,930Perforated
12,07012,090Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,60017.51,065 S
9.6258,50012.25815 S
2.87512,3878.51,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 15, 1998May 29, 1998Yes
00Jun 3, 1998——
00May 12, 1997Feb 5, 1997Yes
00May 2, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.