WELL · 42-479-37177 · DISTRICT 4
B.M.T. #109
Webb County · B.M.T. (Lobo Cons.) field · Vertical
B.M.T. #109 (API 42-479-37177) is a well in Webb County operated by Hilcorp Energy Company, completed January 11, 1999.
The RRC has issued 2 drilling permits between 1998 and 2017, permitted to 11,800 ft.
Completion filings report 11 formation tops, including Jackson, Queen City, Yegua, Catahoula.
No lease production has been reported under this well’s leases.
Operator of record
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Hilcorp Energy CompanySep 18, 2017 |
- 11,800
- total depth, ft
- 2
- permits on file
- Sep 18, 2017
- last permit issued
- Jan 11, 1999
- completed
- 0
- cumulative oil, bbl
- 4.59M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 11, 1999
- Shut in
- —
- Plugged
- —
Surface location
27.382674, -99.160659
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Webb County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| B.M.T. G-4-284349 | B.M.T. (Middle Wilcox) | Hilcorp Energy Company | 1 | 0 | 434K | Oct 2017 – Jul 2026 |
| B.M.T. G-4-172203 | B.M.T. (Lobo Cons.) | Hilcorp Energy Company | 1 | 0 | 4.16M | Jan 1999 – Jun 2018 |
Gas, mcf lease total
Last 12 months 47,564 · prior 12 46,875(+1%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Conoco Inc.Jan 1999 → Dec 2002
- 2Conocophillips CompanyJan 2003 → Nov 2015
- 3Hilcorp Energy CompanyJan 2016 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 830885-99 | Recompletion | Hilcorp Energy Company | Sep 12, 2017 | Sep 18, 2017 | Oct 17, 2017 | 11,250 |
| 481126-99 | Drill | Conoco Inc. | Nov 24, 1998 | Nov 24, 1998 | Dec 6, 1998 | 11,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-172203 | — | — | — | — |
| — | — G-4-284349 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 489 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| JacksonJACKSON - INJECTION/DISPOSAL | 690 | -201 |
| Queen CityQUEEN CITY - INJECTION/DISPOSAL; | 900 | -411 |
| YeguaYEGUA - INJECTION/DISPOSAL | 1,100 | -611 |
| CatahoulaCATAHOULA-FRIO - INJECTION/DISPO | 1,500 | -1,011 |
| WilcoxWILCOX - INJECTION/DISPOSAL | 1,800 | -1,311 |
| EscondidoESCONDITO - INJECTION/DISPOSAL; | 2,300 | -1,811 |
| Cook Mountain | 3,970 | -3,481 |
| OlmosOLMOS - INJECTION/DISPOSAL | 4,200 | -3,711 |
| Eagle FordEAGLE FORD SHALE | 8,000 | -7,511 |
| EdwardsEDWARDS LIMESTONE - H2S | 8,800 | -8,311 |
| WilcoxBASE OF LOWER WILCOX | 9,274 | -8,785 |
| Wills Point | 11,150 | -10,661 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,224 | 7,234 | Perforated |
| 7,362 | 7,372 | Perforated |
| 9,736 | 9,830 | Perforated |
| 10,842 | 10,872 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10 | 1,519 | 12 | 479 S |
| 9.625 | 1,519 | 12.25 | 479 S |
| 7 | 7,816 | 8.75 | 280 S |
| 7 | 7,816 | 9 | 280 S |
| 5 | 11,237 | 6 | 361 S |
| 4.5 | 11,237 | 6.25 | 361 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 24, 2018 | Jul 2, 2018 | — |
| 00 | Apr 5, 1999 | Feb 16, 1999 | Yes |
| 00 | Mar 26, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-37177 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-37177 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
B.M.T.42-479-36583
1.6 KM · Transtexas Gas Corporation · Section with this well →
| Yegua | 1,016 | -536 |
| Cook Mountain | 1,649 | -1,169 |
| Queen City | 2,651 | -2,171 |
| Wilcox | 5,155 | -4,675 |
| Wilcox | 5,171 | -4,691 |
| Wilcox | 7,844 | -7,364 |
| Wills Point | 11,300 | -10,820 |
B.M.T.42-479-32138
1.9 KM · Hilcorp Energy Company · Section with this well →
| Jackson | 690 | -156 |
| Queen City | 900 | -366 |
| Yegua | 1,100 | -566 |
| Catahoula | 1,500 | -966 |
| Wilcox | 1,800 | -1,266 |
| Escondido | 2,300 | -1,766 |
| Cook Mountain | 3,970 | -3,436 |
| Olmos | 4,200 | -3,666 |
11 TOPS · FIRST 8
B.M.T.42-479-37416
2.0 KM · Hilcorp Energy Company · Section with this well →
| Jackson | 690 | -203 |
| Queen City | 900 | -413 |
| Yegua | 1,100 | -613 |
| Catahoula | 1,500 | -1,013 |
| Wilcox | 1,800 | -1,313 |
| Escondido | 2,300 | -1,813 |
| Cook Mountain | 3,970 | -3,483 |
| Olmos | 4,200 | -3,713 |
12 TOPS · FIRST 8
Gloria Benavides BMT 'A'42-479-37786
2.1 KM · Hilcorp Energy Company · Section with this well →
| Jackson | 690 | -179 |
| Queen City | 900 | -389 |
| Yegua | 1,100 | -589 |
| Catahoula | 1,500 | -989 |
| Wilcox | 1,800 | -1,289 |
| Escondido | 2,300 | -1,789 |
| Cook Mountain | 3,970 | -3,459 |
| Olmos | 4,200 | -3,689 |
12 TOPS · FIRST 8
B.M.T.42-479-36876
2.1 KM · Hilcorp Energy Company · Section with this well →
| Yegua | 1,016 | -517 |
| Cook Mountain | 1,649 | -1,150 |
| Queen City | 2,651 | -2,152 |
| Wilcox | 5,155 | -4,656 |
| Wilcox | 9,311 | -8,812 |
| Wills Point | 10,511 | -10,012 |
| Escondido | — | |
| Eagle Ford | — |
12 TOPS · FIRST 8
B.M.T.42-479-36437
2.1 KM · Transtexas Gas Corporation · Section with this well →
| Yegua | 1,010 | -525 |
| Cook Mountain | 1,646 | -1,161 |
| Queen City | 2,651 | -2,166 |
| Wilcox | 5,135 | -4,650 |
| Wilcox | 5,153 | -4,668 |
| Wilcox | 7,764 | -7,279 |
| Wills Point | 11,400 | -10,915 |
| Catahoula | — |
13 TOPS · FIRST 8
B.M.T.42-479-37411
2.1 KM · Hilcorp Energy Company · Section with this well →
| Jackson | 690 | -187 |
| Queen City | 900 | -397 |
| Yegua | 1,100 | -597 |
| Catahoula | 1,500 | -997 |
| Wilcox | 1,800 | -1,297 |
| Escondido | 2,300 | -1,797 |
| Cook Mountain | 3,970 | -3,467 |
| Olmos | 4,200 | -3,697 |
12 TOPS · FIRST 8
B.M.T.42-479-37047
2.5 KM · Hilcorp Energy Company · Section with this well →
| Jackson | 690 | -211 |
| Queen City | 900 | -421 |
| Yegua | 1,100 | -621 |
| Catahoula | 1,500 | -1,021 |
| Wilcox | 1,800 | -1,321 |
| Escondido | 2,300 | -1,821 |
| Cook Mountain | 3,970 | -3,491 |
| Olmos | 4,200 | -3,721 |
12 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47937177, documented in the API reference.