WELL · 42-479-37959 · DISTRICT 4

Mayers #13

Y

Webb County · Rottersman (Lobo) field · Producing  · Vertical

Mayers #13 (API 42-479-37959) is a well in Webb County operated by Arete Operating Company LLC, completed December 1, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 3, 2001, permitted to 10,300 ft.

It was permitted by Michael Petroleum Corporation and has since transferred to Arete Operating Company LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Lobo Unconformity, Wills Point.

No lease production has been reported under this well’s leases.

Operator of record

Arete Operating Company LLC

Permitted by Michael Petroleum Corporation; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed May 4, 2026 · 10 permits on file · (210) 325-9383

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArete Operating Company LLC
Production reportsArete Operating Company, LLCthrough Apr 2026
Latest permitMichael Petroleum CorporationOct 3, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,300
total depth, ft
1
permits on file
Oct 3, 2001
last permit issued
Dec 1, 2001
completed
0
cumulative oil, bbl
322K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mayers G-4-186736Rottersman (Lobo)Arete Operating Company, LLC10322KDec 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 2,839 · prior 12 2,321(+22%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Calpine Natural Gas CompanyDec 2001 → Apr 2002
  2. 2Calpine Natural Gas Company L.P.May 2002 → Jul 2002
  3. 3Calpine Natural Gas L.P.Aug 2002 → Dec 2005
  4. 4Rosetta Resources Operating LPJan 2006 → Mar 2012
  5. 5Pinpoint Energy Operating, LLCApr 2012 → Aug 2012
  6. 6Petropoint Energy Operating, LLCSep 2012 → Jul 2014
  7. 7White Oak Operating Company LLCAug 2014 → Dec 2020
  8. 8Arete Operating Company III, LLCJan 2021 → Jun 2025
  9. 9Arete Operating Company, LLCJul 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
514171-99DrillMichael Petroleum CorporationOct 3, 2001Oct 3, 2001Oct 30, 200110,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-186736————

Formation tops

As filed on W-2/G-1. Subsea from 512 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo Unconformity8,600-8,088
Wills Point10,050-9,538

Perforations

Perforated and open-hole intervals.

FromToType
8,6258,642Perforated
8,6538,668Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,47512.25505 S
77,7618.75290 S
3.510,1036.125320 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 1, 2002Dec 28, 2001Yes
00Feb 6, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47937959, documented in the API reference.