WELL · 42-479-38018 · DISTRICT 4

EL Gato #25

Y

Webb County · Vaquillas Ranch (Lobo Cons.) field · Producing  · Vertical

El Gato #25 (API 42-479-38018) is a well in Webb County operated by Hilcorp Energy Company, completed May 25, 2006 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 8, 2002, permitted to 9,900 ft.

It was permitted by Four Star Oil And Gas Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Lobo Uncomformity, Lobo Unconformity, Lobo 6, Wills Point.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Four Star Oil and Gas Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitFour Star Oil and Gas CompanyJan 8, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,900
total depth, ft
1
permits on file
Jan 8, 2002
last permit issued
May 25, 2006
completed
0
cumulative oil, bbl
877K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 25, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
EL Gato G-4-188726Vaquillas Ranch (Lobo Cons.)Hilcorp Energy Company10877KMar 2002 – Jul 2026

Gas, mcf lease total

Last 12 months 231 · prior 12 414(-44%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Four Star Oil and Gas CompanyApr 2002 → Sep 2003
  2. 2Axio Production Company, L.P.Oct 2003 → Jan 2006
  3. 3Chesapeake Operating, Inc.Feb 2006 → Jul 2014
  4. 4Hilcorp Energy CompanySep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
516640-99DrillFour Star Oil and Gas CompanyJan 8, 2002Jan 8, 2002Feb 15, 20029,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-188726————

Formation tops

As filed on W-2/G-1. Subsea from 450 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo Uncomformity7,775-7,325
Lobo Unconformity7,775-7,325
Lobo 68,450-8,000
Wills Point8,692-8,242

Perforations

Perforated and open-hole intervals.

FromToType
7,9127,916Perforated
7,9327,840Perforated
7,9567,958Perforated
7,9568,614Perforated
8,5138,523Perforated
8,5848,614Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,02714.75685 S
7.6257,4859.375915 S
4.58,8906.5260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 28, 2007Jun 26, 2006—
00Aug 9, 2002Jul 5, 2002—
00Jul 8, 2002May 8, 2002Yes
00May 30, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47938018, documented in the API reference.