WELL · 42-479-39494 · DISTRICT 4
Killam & Hurd Fee Porcion 16 #1601
Webb County · Vallecillo (Middle Wilcox) field · Vertical
Killam & Hurd Fee Porcion 16 #1601 (API 42-479-39494) is a well in Webb County operated by Killam Oil CO. Ltd., completed August 1, 2006.
The RRC has issued 3 drilling permits (amended once) between 2006 and 2010, permitted to 7,210 ft.
Completion filings report 2 formation tops, including Queen City, Wilcox.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 156K barrels injected in the 12 months reported through January 2026.
Operator of record
Laredo, TX · P-5 Y, filed Feb 4, 2026 · 837 permits on file · (956) 724-7141
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Killam Oil Co. Ltd. |
| Production reports | Killam Oil Co., Ltd.through Jun 2020 |
| Latest permit | Killam Oil Co., Ltd.Jul 29, 2010 |
- 7,210
- total depth, ft
- 4
- permits on file
- Jul 29, 2010
- last permit issued
- Aug 1, 2006
- completed
- 0
- cumulative oil, bbl
- 1.53M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 1, 2006
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| K&H Fee Porcion G-4-257256 | Vallecillo (Middle Wilcox) | Killam Oil Co., Ltd. | 1 | 0 | 952K | May 2010 – Jul 2026 |
| Killam & Hurd Fee Porcion 16 G-4-253313 | Del Mar (Lobo Cons.) | Killam Oil Co., Ltd. | 1 | 0 | 14.3K | May 2009 – May 2010 |
| Killam & Hurd Fee Porcion 16 G-4-224953 | Vallecillo (Middle Wilcox) | Killam Oil Co., Ltd. | 1 | 0 | 567K | Aug 2006 – May 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Killam Oil Co., Ltd.Aug 2006 → Jun 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 698430-99 | Recompletion | Killam Oil Co., Ltd. | Jul 1, 2010 | Jul 29, 2010 | Apr 30, 2010 | 7,210 |
| 685178-99 | Recompletion | Killam Oil Co., Ltd. | Sep 16, 2009 | Sep 17, 2009 | May 5, 2009 | 7,210 |
| 618407-98 | Drill | Killam Oil Co., Ltd. | Feb 9, 2007 | May 1, 2006 | Jun 25, 2006 | 7,210 |
| 618407-99 | Drill | Killam Oil Co., Ltd. | Apr 28, 2006 | May 1, 2006 | — | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-224953 | — | — | — | — |
| — | — G-4-253313 | — | — | — | — |
| — | — G-4-257256 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 573 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen CityTOP OF QUEEN CITY | 1,772 | -1,199 |
| WilcoxTOP OF WILCOX | 2,740 | -2,167 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,115 | 4,122 | Perforated |
| 4,115 | 4,556 | Perforated |
| 4,206 | 4,212 | Perforated |
| 4,223 | 4,227 | Perforated |
| 4,243 | 4,252 | Perforated |
| 4,243 | 4,258 | Perforated |
| 4,252 | 4,258 | Perforated |
| 4,261 | 4,264 | Perforated |
| 4,378 | 4,384 | Perforated |
| 4,550 | 4,556 | Perforated |
| 7,036 | 7,050 | Perforated |
| 7,103 | 7,116 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,235 | 12.25 | 440 S |
| 4.5 | 4,010 | 7.875 | 626 S |
| 4.5 | 7,190 | 7.875 | 773 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 10, 2024 | Sep 23, 2024 | — |
| 00 | Jun 28, 2024 | Jul 10, 2023 | — |
| 00 | Jun 21, 2024 | Jun 19, 2023 | — |
| 00 | Nov 6, 2019 | Oct 31, 2019 | Yes |
| 00 | Oct 21, 2016 | Sep 30, 2016 | — |
| 00 | Sep 29, 2010 | Sep 13, 2010 | — |
| 00 | Sep 20, 2010 | Sep 7, 2010 | Yes |
| 00 | Sep 10, 2010 | — | — |
| 00 | Feb 26, 2010 | Jul 2, 2009 | Yes |
| 00 | Dec 9, 2009 | — | — |
| 00 | May 4, 2007 | Feb 5, 2006 | Yes |
| 00 | Mar 1, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-39494 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-39494 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 156K
- bbl, last 12 reported months
- 533K
- bbl, all reported
- Jan 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000125927 | H-1 Injection | Active | 10,000 | 2,057 | 4,115–4,556 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 156,299 · prior 12 376,812(-59%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47939494, documented in the API reference.