WELL · 42-479-39645 · DISTRICT 4
Olmitos Ranch-Gatita #1
Webb County · Vaquillas Ranch (Lobo Cons.) field · Temp Abandoned · Vertical
Olmitos Ranch-Gatita #1 (API 42-479-39645) is a well in Webb County operated by Three-C Oil And Gas, completed December 17, 2006 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued September 20, 2006, permitted to 10,800 ft.
It was permitted by Chapco, Inc. and has since transferred to Three-C Oil And Gas on the wellbore schedule.
Completion filings report 3 formation tops, including Walker, Lobo 1, Lobo 6.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Chapco, Inc.; the EWA schedule now lists a different operator.
Hebbronville, TX · P-5 Y, filed Jul 4, 2026 · (361) 231-2638
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Three-C Oil and Gas |
| Production reports | Safari Production Company, Inc.through Feb 2019 |
| Latest permit | Chapco, Inc.Sep 20, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,800
- total depth, ft
- 1
- permits on file
- Sep 20, 2006
- last permit issued
- Dec 17, 2006
- completed
- 0
- cumulative oil, bbl
- 17.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 17, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Olmitos Ranch-Gatita G-4-228999 | Vaquillas Ranch (Lobo Cons.) | Three-C Oil and Gas | 1 | 0 | 17.8K | Dec 2006 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chapco, Inc.Dec 2006 → Jul 2007
- 2Mohican Operating, L.L.C.Oct 2014 → Apr 2018
- 3Safari Production Company, Inc.Sep 2018 → Feb 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 625711-99 | Drill | Chapco, Inc. | Sep 11, 2006 | Sep 20, 2006 | Oct 13, 2006 | 10,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-228999 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 499 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Walker | 8,405 | -7,906 |
| Lobo 1 | 8,605 | -8,106 |
| Lobo 6 | 9,150 | -8,651 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,301 | 8,318 | Perforated |
| 8,330 | 8,336 | Perforated |
| 8,408 | 8,416 | Perforated |
| 8,701 | 8,728 | Perforated |
| 9,192 | 9,207 | Perforated |
| 9,224 | 9,254 | Perforated |
| 9,316 | 9,365 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 653 | 12.25 | 229 S |
| 7 | 7,585 | 8.75 | 329 S |
| 4.5 | 9,800 | 6.125 | 315 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 25, 2015 | Dec 29, 2014 | — |
| 00 | Jul 1, 2008 | Mar 9, 2007 | Yes |
| 00 | Aug 21, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-39645 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-39645 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47939645, documented in the API reference.