WELL · 42-479-40278 · DISTRICT 4
C.H. Ramirez Minerals Ltd. #2
Webb County · Barrera (Lobo 6) field · Temp Abandoned · Vertical
C.H. Ramirez Minerals Ltd. #2 (API 42-479-40278) is a permitted well in Webb County filed by Laredo Energy; no completion report is on file yet.
The RRC has issued one drilling permit (amended once), issued June 28, 2008, permitted to 10,500 ft.
It was permitted by Laredo Energy and has since transferred to Lucky Lad Energy LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Wilcox, Wills Point.
Operator of record
Permitted by Laredo Energy; the EWA schedule now lists a different operator.
Magnolia, TX · P-5 Y, filed Jun 4, 2026 · (832) 390-1060
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lucky Lad Energy LLC |
| Production reports | Lucky Lad Energy, LLCthrough Feb 2026 |
| Latest permit | Laredo EnergyJun 28, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 2
- permits on file
- Jun 28, 2008
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.57M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| C.H. Ramirez Minerals Ltd. G-4-247329 | Barrera (Lobo 6) | Lucky Lad Energy, LLC | 1 | 0 | 1.57M | Nov 2008 – Jul 2026 |
Gas, mcf lease total
Last 12 months 4,052 · prior 12 4,798(-16%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Laredo EnergyNov 2008 → Jul 2012
- 2Encina Resources, LLCOct 2020 → Dec 2025
- 3Lucky Lad Energy, LLCJan 2026 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 664235-98 | Drill | Laredo Energy | Nov 4, 2008 | Jun 28, 2008 | Oct 9, 2008 | 10,500 |
| 664235-99 | Drill | Laredo Energy | Jun 11, 2008 | Jun 28, 2008 | — | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-247329 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 524 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 3,600 | -3,076 |
| WilcoxLOWER WILCOX | 6,400 | -5,876 |
| Wills Point | 8,400 | -7,876 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,132 | 8,162 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 680 | 12.25 | 303 S |
| 7 | 6,291 | 8.75 | 400 S |
| 4.5 | 8,500 | 6.125 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 13, 2010 | Nov 17, 2009 | — |
| 00 | Nov 16, 2009 | Sep 14, 2009 | — |
| 00 | Jun 17, 2009 | Feb 23, 2009 | Yes |
| 00 | May 28, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-40278 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-40278 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47940278, documented in the API reference.