WELL · 42-479-40743 · DISTRICT 4
Gates 05-D #102
Webb County · Hawkville (Eagleford Shale) field · Horizontal
Gates 05-D #102 (API 42-479-40743) is a horizontal well in Webb County operated by Rosetta Resources Operating LP, completed June 24, 2010.
The RRC has issued 2 drilling permits between 2009 and 2011, permitted to 9,500 ft.
Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.
No lease production has been reported under this well’s leases.
Operator of record
Rosetta Resources Operating LP
San Antonio, TX · P-5 Y, filed Aug 4, 2025 · 1,218 permits on file · (210) 384-5000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rosetta Resources Operating LP |
| Production reports | Rosetta Resources Operating LPthrough Apr 2026 |
| Latest permit | Rosetta Resources Operating LPFeb 3, 2011 |
- 9,500
- total depth, ft
- 2
- permits on file
- Feb 3, 2011
- last permit issued
- Jun 24, 2010
- completed
- 0
- cumulative oil, bbl
- 2.01M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 24, 2010
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gates 05-D G-4-258925 | Gates Ranch (Eagle Ford Shale) | Rosetta Resources Operating LP | 1 | 0 | 1.86M | Oct 2010 – Jul 2026 |
| Gates 05-D G-1-257858 | Hawkville (Eagleford Shale) | Rosetta Resources Operating LP | 1 | 0 | 152K | Jun 2010 – Apr 2011 |
Gas, mcf lease total
Last 12 months 57,227 · prior 12 70,445(-19%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rosetta Resources Operating LPJun 2010 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 709576-99 | Field transfer | Rosetta Resources Operating LP | Feb 1, 2011 | Feb 3, 2011 | Mar 9, 2010 | 9,500 |
| 688788-99 | Drill | Rosetta Resources Operating LP | Dec 17, 2009 | Dec 18, 2009 | Mar 9, 2010 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-257858 | — | — | — | — |
| — | — G-4-258925 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 619 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 7,492 | -6,873 |
| Austin Chalk | 7,873 | -7,254 |
| Eagle FordLOWER EAGLE FORD | 8,517 | -7,898 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,981 | 13,444 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,115 | 12.25 | 676 S |
| 5.5 | 13,528 | 8.75 | 2,211 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 3, 2011 | Jan 28, 2011 | — |
| 00 | Feb 18, 2011 | — | — |
| 00 | Nov 2, 2010 | Jul 19, 2010 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-40743 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-40743 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47940743, documented in the API reference.