WELL · 42-479-41647 · DISTRICT 4
Hachar #1H
Webb County · Bashara-Hereford (Navarro) field · Temp Abandoned · Horizontal
Hachar #1H (API 42-479-41647) is a horizontal well in Webb County operated by Lakeshore Operating LLC, completed July 27, 2012 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued January 5, 2012, permitted to 13,000 ft.
It was permitted by Hughes, Dan A. Company, L.P. and has since transferred to Lakeshore Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Lobo Unconformity, Cretaceous, Navarro.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Hughes, Dan A. Company, L.P.; the EWA schedule now lists a different operator.
Wichita, KS · P-5 Y, filed Oct 4, 2025 · (855) 771-4828
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lakeshore Operating LLC |
| Production reports | Flint Oak Energy, LLCthrough Aug 2024 |
| Latest permit | Hughes, Dan A. Company, L.P.Jan 5, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,000
- total depth, ft
- 2
- permits on file
- Jan 5, 2012
- last permit issued
- Jul 27, 2012
- completed
- 0
- cumulative oil, bbl
- 447K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 27, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hachar G-4-268923 | Bashara-Hereford (Navarro) | Lakeshore Operating, LLC | 1 | 0 | 447K | Jul 2012 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 4,061(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hughes, Dan A. Company, L.P.Aug 2012 → Mar 2014
- 2Oak Energy, LLCApr 2014 → Nov 2015
- 3Battlecat Oil & Gas, LLCDec 2015 → Jul 2017
- 4Hopco E&P, LLCAug 2017 → Jun 2022
- 5Flint Oak Energy, LLCJul 2022 → Aug 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 730878-98 | Drill | Hughes, Dan A. Company, L.P. | Oct 10, 2012 | Jan 5, 2012 | Jan 16, 2012 | 13,000 |
| 730878-99 | Drill | Hughes, Dan A. Company, L.P. | Jan 3, 2012 | Jan 5, 2012 | — | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-268923 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 453 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lobo Unconformity | 6,610 | -6,157 |
| Cretaceous | 7,358 | -6,905 |
| NavarroNAVARRO "A" | 7,720 | -7,267 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,150 | 12,502 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 920 | 17.5 | 880 S |
| 9.625 | 5,830 | 12.25 | 560 S |
| 4.5 | 12,668 | 6.75 | 850 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 26, 2013 | Oct 17, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-41647 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-41647 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47941647, documented in the API reference.