WELL · 42-481-02007 · DISTRICT 3
Wallace R.B. #3
Wharton County · Niels Carlsen (Frio 5260) field · Vertical
Wallace R.B. #3 (API 42-481-02007) is a plugged well in Wharton County, plugged June 4, 2009, last operated by Harrison Sam G. Oil Inc..
The RRC has issued one drilling permit, issued September 6, 1988, permitted to 7,200 ft.
It was permitted by Harrison, Sam G. and has since transferred to Harrison Sam G. Oil Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Marginulinace.
Its lease has reported 7.18K barrels of oil and 7.82K mcf of gas since January 1993, last reporting in October 2009.
Operator of record
Permitted by Harrison, Sam G.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Nov 8, 2019 · 16 permits on file · (713) 569-7376
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Harrison Sam G. Oil Inc. |
| Production reports | Harrison, Sam G. Oil, Inc.through Dec 1995 |
| Latest permit | Harrison, Sam G.Sep 6, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,200
- total depth, ft
- 1
- permits on file
- Sep 6, 1988
- last permit issued
- Oct 20, 1988
- completed
- 7.18K
- cumulative oil, bbl
- 7.82K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 20, 1988
- Shut in
- —
- Plugged
- Jun 4, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wallace, R.B. O-3-20301 | Niels Carlsen (Frio 5260) | Harrison, Sam G. Oil, Inc. | 1 | 7.18K | 7.82K | Jan 1993 – Oct 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Harrison, Sam G. Oil, Inc.Jan 1993 → Dec 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 350754-99 | Recompletion | Harrison, Sam G. | Sep 1, 1988 | Sep 6, 1988 | — | 7,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-20301 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 78 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)BASE OF MIOCENE | 2,140 | -2,062 |
| Marginulinace | 5,165 | -5,087 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,251 | 5,255 | Perforated |
| — | 6,250 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 693 | — | 350 S |
| 5.5 | 6,312 | — | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 1, 1988 | Nov 14, 1988 | Yes |
| 00 | Nov 23, 1988 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-02007 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-02007 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48102007, documented in the API reference.