WELL · 42-481-32025 · DISTRICT 3
Holub, E. #1
Wharton County · Vertical
Holub, E. #1 (API 42-481-32025) is a plugged well in Wharton County, plugged May 15, 2007, last operated by Louise Vacuum Service, Inc..
The RRC has issued 4 drilling permits between 1980 and 1985, permitted to 7,512 ft.
Operator of record
Louise, TX · P-5 Y, filed Apr 1, 1992 · 1 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Louise Vacuum Service, Inc.Sep 25, 1985 |
- 7,512
- total depth, ft
- 4
- permits on file
- Sep 25, 1985
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- May 15, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Holub, Edmond G-3-123935 | EL Campo | XOG Operating LLC | 1 | 0 | 0 | Jan 1993 – May 2007 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 285653-99 | Other | Louise Vacuum Service, Inc. | Sep 9, 1985 | Sep 25, 1985 | — | 5,000 |
| 130774-99 | Recompletion | Realitos V Exploratory Program | Aug 24, 1981 | Aug 24, 1981 | — | 7,512 |
| 118356-99 | Recompletion | Realitos V Exploratory Program | May 18, 1981 | May 18, 1981 | — | 7,512 |
| 90769-99 | Drill | Realitos Energy Corp. | Aug 22, 1980 | Aug 22, 1980 | — | 7,512 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-123935 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,280 | 4,310 | Perforated |
| 4,900 | 4,910 | Perforated |
| 6,545 | 6,547 | Perforated |
| 6,766 | 6,770 | Perforated |
| 6,862 | 6,866 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 561 | 12.25 | 280 S |
| 4.5 | 1,814 | 7.875 | 325 S |
| 2.375 | 6,444 | — | — |
| 2.375 | 6,823 | — | — |
| 4.5 | 7,500 | 7.875 | 430 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 10, 1996 | Nov 13, 1995 | — |
| 00 | May 27, 1987 | Apr 24, 1987 | — |
| 00 | May 12, 1987 | — | — |
| 00 | Jan 12, 1984 | Jun 4, 1981 | — |
| 00 | Jan 12, 1984 | Dec 30, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-32025 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-32025 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 489K
- bbl, all reported
- Dec 2006
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000065696 | W-14 Disposal | Plugged Jul 2, 2007 | 2,000 | 2,100 | 4,276–4,310 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 386(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48132025, documented in the API reference.