WELL · 42-481-32498 · DISTRICT 3

Reitz E. E. A #1

Plugged

Wharton County · EL Campo West (5035 Stringer) field  · Vertical

Reitz E. E. A #1 (API 42-481-32498) is a plugged well in Wharton County, plugged May 4, 2007, last operated by M. E. Operating.

The RRC has issued 2 drilling permits between 1983 and 1985, permitted to 5,400 ft.

It was permitted by Carter Exploration Company and has since transferred to M. E. Operating on the wellbore schedule.

Completion filings report 6 formation tops, including Fresh Water, Catahoula, Bottomcatahoula Mass., Bottom Catahoula Massive.

Operator of record

M. E. Operating

Permitted by Carter Exploration Company; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed Jul 4, 2026

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleM. E. Operating
Production reportsnone
Latest permitCarter Exploration CompanyJun 28, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,400
total depth, ft
2
permits on file
Jun 28, 1985
last permit issued
Dec 31, 1985
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 31, 1985
Shut in
—
Plugged
May 4, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reitz, E. E. "A" G-3-117247EL Campo, West (5035 Stringer)M. E. Operating100Jan 1993 – May 2007

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
279045-99RecompletionCarter Exploration CompanyMay 6, 1985Jun 28, 1985—5,280
198622-99DrillCarter Exploration CompanyMay 26, 1983May 26, 1983—5,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-117247————

Formation tops

As filed on W-2/G-1. Subsea from 89 ft elevation.Download CSV →

FormationMD ftSubsea
Fresh Water1,700-1,611
CatahoulaCATAHOULA MASSIVE4,355-4,266
CatahoulaTOP CATAHOULA MASSIVE4,355-4,266
Bottomcatahoula Mass.4,525-4,436
Bottom Catahoula Massive4,525-4,436
GretaGRETA MASSIVE5,112-5,023
GretaTOP GRETA MASSIVE5,112-5,023
Bottom Greta Massive5,242-5,153

Perforations

Perforated and open-hole intervals.

FromToType
4,4904,510Perforated
5,0335,037Perforated
5,0825,086Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62548713.5405 S
2.3752,933——
4.55,2627.8751,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 1986May 9, 1986—
00May 22, 1986May 5, 1986—
00Nov 21, 1985May 6, 1985—
00Jul 26, 1985——
00Jan 12, 1984Oct 11, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
586K
bbl, all reported
Dec 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000059198W-14 DisposalPlugged May 24, 2007004,490–4,510

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48132498, documented in the API reference.