WELL · 42-481-32840 · DISTRICT 3
Gilbert #2
Wharton County · Vertical
Gilbert #2 (API 42-481-32840) is a permitted well in Wharton County filed by Forrest Energy, LLC; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1985 and 1996, permitted to 8,012 ft.
Completion filings report 3 formation tops, including Frio, Vicksburg, Yegua.
Operator of record
Hattiesburg, MS · P-5 Y, filed Nov 5, 1999 · 10 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Xeric Oil & Gas Corporationthrough Aug 2003 |
| Latest permit | Forrest Energy, LLCJun 11, 1996 |
- 8,012
- total depth, ft
- 2
- permits on file
- Jun 11, 1996
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 89.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gilbert G-3-118263 | Bernard, W. (Boettcher 7380) | XOG Operating LLC | 1 | 0 | 89.7K | Jan 1993 – Apr 2025 |
| Gilbert G-3-122296 | Bernard, W. (7850) | XOG Operating LLC | 1 | 0 | 0 | Jan 1993 – Apr 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Great Western Onshore Inc.Jan 1993 → May 1996
- 2Forrest Energy, LLCJun 1996 → Jun 1997
- 3Fredonia Resources Inc.Jul 1997 → Sep 2000
- 4Silver Pines Energy Corp.Oct 2000 → Mar 2003
- 5Xeric Oil & Gas CorporationApr 2003 → Aug 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 449057-99 | Recompletion | Forrest Energy, LLC | Jun 7, 1996 | Jun 11, 1996 | — | 8,012 |
| 270958-99 | Drill | Forney Oil Corporation | Mar 26, 1985 | Mar 29, 1985 | May 6, 1985 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-118263 | — | — | — | — |
| — | — G-3-122296 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 137 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,386 | 7,394 | Perforated |
| 7,738 | 7,746 | Perforated |
| 7,768 | 7,773 | Perforated |
| 7,778 | 7,794 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,912 | 12.25 | 773 S |
| 4.5 | 8,010 | 7.875 | 555 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 1986 | Sep 25, 1986 | — |
| 00 | Oct 16, 1986 | — | — |
| 00 | Nov 21, 1985 | Oct 1, 1985 | Yes |
| 00 | Nov 6, 1985 | — | — |
| 00 | Oct 23, 1985 | Oct 1, 1985 | — |
| 00 | Oct 8, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-32840 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-32840 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48132840, documented in the API reference.