WELL · 42-481-33446 · DISTRICT 3
Forgason #1
Wharton County · Hungerford (Hungerford 3000) field · Vertical
Forgason #1 (API 42-481-33446) is a plugged well in Wharton County, plugged November 22, 1999, last operated by Range Production Company.
The RRC has issued one drilling permit (amended once), issued October 25, 1990, permitted to 4,020 ft.
It was permitted by Cpx Petroleum, Inc. and has since transferred to Range Production Company on the wellbore schedule.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
Permitted by CPX Petroleum, Inc.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Nov 6, 2015 · 1,666 permits on file · (817) 980-4254
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Range Production Company |
| Production reports | Range Production Companythrough Sep 1998 |
| Latest permit | CPX Petroleum, Inc.Oct 25, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,020
- total depth, ft
- 2
- permits on file
- Oct 25, 1990
- last permit issued
- Dec 20, 1990
- completed
- 0
- cumulative oil, bbl
- 327K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 20, 1990
- Shut in
- —
- Plugged
- Nov 22, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Forgason G-3-137371 | Hungerford (Hungerford 3000) | Range Production Company | 1 | 0 | 327K | Jan 1993 – Nov 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gillring Oil CompanyJan 1993 → May 1994
- 2Lomak Production CompanyJun 1994 → Aug 1998
- 3Range Production CompanySep 1998 → Sep 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 379720-98 | Drill | CPX Petroleum, Inc. | Jan 18, 1991 | Oct 25, 1990 | Dec 3, 1990 | 4,020 |
| 379720-99 | Drill | CPX Petroleum, Inc. | Oct 18, 1990 | Oct 25, 1990 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-137371 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 113 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1,850 | -1,737 |
| Frio | 3,370 | -3,257 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,376 | 3,378 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 420 | 12.25 | 185 S |
| 2.875 | 3,618 | 7.875 | 945 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 2, 1991 | Feb 8, 1991 | Yes |
| 00 | Mar 27, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-33446 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-33446 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48133446, documented in the API reference.