WELL · 42-481-33769 · DISTRICT 3

Schumaker #1

Plugged

Wharton County · New Taiton (Wilcox) field  · Vertical

Schumaker #1 (API 42-481-33769) is a plugged well in Wharton County, plugged June 30, 2021, last operated by Wagner Oil Company.

The RRC has issued 2 drilling permits (amended once) between 1995 and 2002, permitted to 13,500 ft.

It was permitted by Ascent Energy, Inc and has since transferred to Wagner Oil Company on the wellbore schedule.

Completion filings report 4 formation tops, including Vicksburg, Vicksuburg, Yegua, Wilcox.

Operator of record

Wagner Oil Company

Permitted by Ascent Energy, Inc; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 278 permits on file · (800) 457-5332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsHalcon Resources Operating, Inc.through Jun 2012
Latest permitAscent Energy, IncDec 12, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
3
permits on file
Dec 12, 2002
last permit issued
Dec 22, 2002
completed
0
cumulative oil, bbl
11.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1995 THROUGH Jun 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 22, 2002
Shut in
—
Plugged
Jun 30, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schumaker G-3-154710New Taiton (Meek)Wagner Oil Company1011.4MMay 1995 – Jun 2021
Schumaker G-3-193093New Taiton (Wilcox)Wagner Oil Company10492KDec 2002 – Jun 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amerada Hess CorporationMay 1995 → Apr 1997
  2. 2Paladin-Hayes, L.L.C.May 1997 → Dec 1999
  3. 3Dewbre Petroleum CorporationJan 2000 → Feb 2002
  4. 4Ascent Energy, IncMar 2002 → Dec 2004
  5. 5Ascent Operating, LPJan 2005 → Aug 2008
  6. 6Roc Operating, Inc.Sep 2008 → Oct 2008
  7. 7Ram Operating Company, Inc.Nov 2008 → Mar 2012
  8. 8Halcon Resources Operating, Inc.May 2012 → Jun 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
526313-99RecompletionAscent Energy, IncDec 12, 2002Dec 12, 2002Dec 16, 200212,950
432765-98DrillAmerada Hess CorporationJun 15, 1995Feb 10, 1995Mar 10, 199512,950
432765-99DrillAmerada Hess CorporationFeb 10, 1995Feb 10, 1995—13,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-154710————
—— G-3-193093————

Formation tops

As filed on W-2/G-1. Subsea from 140 ft elevation.Download CSV →

FormationMD ftSubsea
Vicksburg5,050-4,910
Vicksuburg5,050-4,910
Yegua5,720-5,580
Wilcox10,786-10,646

Perforations

Perforated and open-hole intervals.

FromToType
11,31011,322Perforated
12,29712,387Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,08013.51,175 S
7.62510,2879.8751,120 S
2.62510,2879.8751,120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 2003Feb 24, 2003Yes
00Mar 7, 2003——
00Sep 26, 1995Jun 19, 1995—
00Aug 28, 1995May 19, 1995Yes
00Jul 25, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48133769, documented in the API reference.