WELL · 42-481-33974 · DISTRICT 3
Wendel et AL #1
Wharton County · Wharton West (Frio 4500) field · Vertical
Wendel ET AL #1 (API 42-481-33974) is a plugged well in Wharton County, plugged June 12, 2001, last operated by Carrizo Oil & Gas Inc..
The RRC has issued 2 drilling permits (amended once) between 1997 and 1998, permitted to 5,000 ft.
Completion filings report one formation top, including Frio.
Operator of record
Houston, TX · P-5 Y, filed Aug 7, 2020 · 1,194 permits on file · (713) 358-6255
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Carrizo Oil & Gas Inc. |
| Production reports | Carrizo Oil & Gas, Inc.through Apr 2000 |
| Latest permit | Carrizo Oil & Gas, Inc.Dec 28, 1998 |
- 5,000
- total depth, ft
- 3
- permits on file
- Dec 28, 1998
- last permit issued
- Oct 7, 1997
- completed
- 0
- cumulative oil, bbl
- 480K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1997 THROUGH Jun 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 7, 1997
- Shut in
- —
- Plugged
- Jun 12, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wendel et AL G-3-171434 | Wharton, West (Frio 4443) | Carrizo Oil & Gas, Inc. | 1 | 0 | 287K | Dec 1998 – Jun 2001 |
| Wendel et AL G-3-165926 | Wharton, West (Frio 4500) | Carrizo Oil & Gas, Inc. | 1 | 0 | 193K | Oct 1997 – Dec 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hall-Houston Oil CompanyDec 1997 → Sep 1998
- 2Carrizo Oil & Gas, Inc.Nov 1998 → Apr 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 481802-99 | Recompletion | Carrizo Oil & Gas, Inc. | Dec 28, 1998 | Dec 28, 1998 | Dec 19, 1998 | 4,800 |
| 464256-98 | Drill | Hall-Houston Oil Company | Dec 12, 1997 | Jun 26, 1997 | — | 5,000 |
| 464256-99 | Drill | Hall-Houston Oil Company | Jun 26, 1997 | Jun 26, 1997 | Jul 25, 1997 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-165926 | — | — | — | — |
| — | — G-3-171434 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 105 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,443 | 4,447 | Perforated |
| 4,546 | 4,552 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 465 | 12.25 | 200 S |
| 4.5 | 4,800 | 7.875 | 818 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 4, 1999 | Jan 20, 1999 | Yes |
| 00 | Jan 28, 1999 | — | — |
| 00 | Jan 28, 1998 | Dec 18, 1997 | Yes |
| 00 | Jan 15, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-33974 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-33974 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48133974, documented in the API reference.