WELL · 42-481-34082 · DISTRICT 3
Fenner-Morton #3
Wharton County · Lost Fork (Frio 3780) field · Vertical
Fenner-Morton #3 (API 42-481-34082) is a plugged well in Wharton County, plugged April 22, 2004, last operated by Gruy Petroleum Management CO..
The RRC has issued 2 drilling permits between 1998 and 2003, permitted to 6,800 ft.
Completion filings report 3 formation tops, including Frio, Vicksburg, Yegua.
Operator of record
Irving, TX · P-5 Y, filed May 2, 2008 · 678 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gruy Petroleum Management Co. |
| Production reports | Prize Operating Companythrough Sep 2000 |
| Latest permit | Gruy Petroleum Management Co.May 13, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,800
- total depth, ft
- 2
- permits on file
- May 13, 2003
- last permit issued
- Dec 23, 1998
- completed
- 0
- cumulative oil, bbl
- 115K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1998 THROUGH Apr 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 23, 1998
- Shut in
- —
- Plugged
- Apr 22, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fenner-Morton G-3-194628 | Wildcat | Gruy Petroleum Management Co. | 1 | 0 | 0 | May 2003 – Apr 2004 |
| Fenner-Morton G-3-174332 | Lost Fork (Frio 3780) | Gruy Petroleum Management Co. | 1 | 0 | 115K | Dec 1998 – May 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Prize Operating CompanyAug 1999 → Sep 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 531190-99 | Recompletion | Gruy Petroleum Management Co. | Apr 28, 2003 | May 13, 2003 | May 13, 2003 | 3,750 |
| 480061-99 | Drill | Eex Corporation | Oct 9, 1998 | Oct 9, 1998 | Nov 29, 1998 | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-174332 | — | — | — | — |
| — | — G-3-194628 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 116 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,503 | 2,506 | Perforated |
| 3,779 | 3,784 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,800 | 12.25 | 785 S |
| 2.875 | 4,007 | 7.875 | 440 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 9, 2003 | May 23, 2003 | Yes |
| 00 | Jun 4, 2003 | — | — |
| 00 | Oct 20, 1999 | Apr 9, 1999 | Yes |
| 00 | Oct 5, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-34082 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-34082 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48134082, documented in the API reference.