WELL · 42-481-34382 · DISTRICT 3

Krenek-Heyne Gas Unit #1

Y

Wharton County · Bonus SW. (Wilcox) field · Producing  · Vertical

Krenek-Heyne Gas Unit #1 (API 42-481-34382) is a well in Wharton County operated by Mountain V Texas LLC, completed March 12, 2005 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 12, 2001, permitted to 14,000 ft.

It was permitted by Transtexas Gas Corporation and has since transferred to Mountain V Texas LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Frio, Cook Mountain, Wilcox, Meek.

No lease production has been reported under this well’s leases.

Operator of record

Mountain V Texas LLC

Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.

Buckhannon, WV · P-5 Y, filed Jun 4, 2026 · (304) 472-1613

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMountain V Texas LLC
Production reportsTMR Exploration, Inc.through Jun 2025
Latest permitTranstexas Gas CorporationJun 12, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
1
permits on file
Jun 12, 2001
last permit issued
Mar 12, 2005
completed
0
cumulative oil, bbl
289K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 12, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Krenek-Heyne Gas Unit G-3-184705Bonus, SW. (Wilcox)Mountain V Texas, LLC10289KAug 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 553 · prior 12 3,052(-82%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transtexas Gas CorporationAug 2001 → Aug 2005
  2. 2National Onshore LPSep 2005 → Mar 2008
  3. 3Sandridge Onshore, LLCApr 2008 → Jun 2014
  4. 4Fieldwood Onshore LLCJul 2014 → Jun 2016
  5. 5TMR Exploration, Inc.Jul 2016 → Jun 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
510194-99DrillTranstexas Gas CorporationJun 12, 2001Jun 12, 2001Jun 19, 200114,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-184705————

Formation tops

As filed on W-2/G-1. Subsea from 126 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO BASE5,025-4,899
FrioFRIO- BASE5,025-4,899
Cook Mountain7,960-7,834
WilcoxMIDDLE WILCOX11,312-11,186
Meek11,584-11,458
WilcoxLOWER WILCOX12,140-12,014

Perforations

Perforated and open-hole intervals.

FromToType
11,34011,462Perforated
11,59611,637Perforated
12,09412,292Perforated
13,12413,154Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,00914.751,205 S
7.62510,5009.875699 S
4.514,0006.5480 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 14, 2005Jun 20, 2005—
00Oct 22, 2001Sep 7, 2001Yes
00Oct 3, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48134382, documented in the API reference.