WELL · 42-481-34390 · DISTRICT 3

Glen Flora Gas Unit #1

Plugged

Wharton County · Spanish Camp S. (Frio 4750) field  · Vertical

Glen Flora Gas Unit #1 (API 42-481-34390) is a plugged well in Wharton County, plugged March 2, 2007, last operated by Acock/Anaqua Operating CO. LC.

The RRC has issued 2 drilling permits (amended once) between 2001 and 2002, permitted to 5,500 ft.

Completion filings report one formation top, including Frio.

Operator of record

Acock/Anaqua Operating Co. LC

Corpus Christ, TX · P-5 Y, filed Jan 5, 2007 · 57 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAcock/Anaqua Operating Co. LC
Production reportsAcock/Anaqua Operating Co., LPthrough Jun 2005
Latest permitAcock/Anaqua Operating Co., LCSep 18, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
3
permits on file
Sep 18, 2002
last permit issued
Feb 25, 2002
completed
0
cumulative oil, bbl
231K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2001 THROUGH Mar 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 25, 2002
Shut in
—
Plugged
Mar 2, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Glen Flora Gas Unit G-3-190885Spanish Camp (Frio 4690)Acock/Anaqua Operating Co., LP10175KSep 2002 – Mar 2007
Glen Flora Gas Unit G-3-185847Spanish Camp, S. (Frio 4750)Acock/Anaqua Operating Co., LC1055.7KOct 2001 – Sep 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Acock Engineering & Assoc., Inc.Oct 2001 → Jul 2002
  2. 2Acock/Anaqua Operating Co., LCAug 2002 → Apr 2004
  3. 3Acock/Anaqua Operating Co., LPMay 2004 → Jun 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
523766-99RecompletionAcock/Anaqua Operating Co., LCSep 17, 2002Sep 18, 2002Sep 19, 20024,800
511294-98DrillAcock Engineering & Assoc., Inc.Nov 6, 2001Jul 11, 2001Aug 20, 20015,500
511294-99DrillAnaqua Oil & Gas, Inc.Jul 11, 2001Jul 11, 2001—5,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-185847————
—— G-3-190885————

Formation tops

As filed on W-2/G-1. Subsea from 116 ft elevation.Download CSV →

FormationMD ftSubsea
FrioTOP OF FRIO3,330-3,214
FrioTOP OF BASAL FRIO3,535-3,419
FrioTOP OF FRIO3,860-3,744
FrioTOP OF BASAL FRIO SAND5,335-5,219
FrioTOP OF BASAL FRIO SD5,335-5,219
FrioTOP OF BASAL FRIO5,342-5,226

Perforations

Perforated and open-hole intervals.

FromToType
4,6494,652Perforated
4,6774,679Perforated
4,7554,759Perforated
4,7864,790Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62557312.25330 S
2.8755,4737.875490 S
2.8755,5067.875872 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 19, 2003Feb 5, 2003—
00Oct 24, 2002Sep 26, 2002Yes
00Oct 10, 2002——
00May 15, 2002Mar 8, 2002Yes
00Dec 13, 2001Oct 31, 2001Yes
00Dec 7, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48134390, documented in the API reference.