WELL · 42-481-34757 · DISTRICT 3
Hlavinka #5
Wharton County · Spanish Camp South (3700) field · Vertical
Hlavinka #5 (API 42-481-34757) is a well in Wharton County operated by Jmm Energy LLC, completed October 4, 2006.
The RRC has issued 3 drilling permits between 2005 and 2011, permitted to 4,200 ft.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Catahoula.
Its 2 leases have reported 184K barrels of oil and 6.95K mcf of gas since January 2005, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 13.8K barrels injected in the 12 months reported through June 2025.
Operator of record
Brownsville, TX · P-5 Y, filed Aug 4, 2025 · 13 permits on file · (817) 907-1557
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | JMM Energy LLC |
| Production reports | Charolais Energy, LLCthrough Mar 2026 |
| Latest permit | JMM Energy LLCDec 8, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,200
- total depth, ft
- 3
- permits on file
- Dec 8, 2011
- last permit issued
- Oct 4, 2006
- completed
- 184K
- cumulative oil, bbl
- 6.95K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 4, 2006
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hlavinka O-3-24654 | Spanish Camp, N. (3268) | Charolais Energy, LLC | 4 | 184K | 6.74K | Jan 2005 – Jul 2026 |
| Hlavinka G-3-222721 | Spanish Camp, South (3700) | JMM Energy LLC | 1 | 0 | 213 | Oct 2006 – Apr 2015 |
Oil, barrels lease total
Last 12 months 2,212 · prior 12 1,502(+47%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Allegro Investments, Inc.Jan 2005 → Aug 2009
- 2Sue-Ann Operating, L.C.Sep 2009 → Oct 2009
- 3JMM Energy LLCNov 2009 → Feb 2021
- 4Howard Exploration, Inc.Oct 2022 → Dec 2025
- 5Charolais Energy, LLCJan 2026 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 729002-99 | Recompletion | JMM Energy LLC | Nov 29, 2011 | Dec 8, 2011 | Jul 11, 2011 | 4,200 |
| 628209-99 | Recompletion | Allegro Investments, Inc. | Oct 27, 2006 | Oct 27, 2006 | — | 4,200 |
| 560425-99 | Drill | Allegro Investments, Inc. | Apr 13, 2005 | Apr 13, 2005 | Apr 21, 2005 | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-222721 | — | — | — | — |
| — | — O-3-24654 | — | — | — | — |
| — | — O-3-24654 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 111 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1,920 | -1,809 |
| Miocene (undifferentiated)MIOCENE (BASE) | 1,920 | -1,809 |
| Miocene (undifferentiated)MIOCENE (BASE0 | 1,920 | -1,809 |
| Catahoula | 3,267 | -3,156 |
| CatahoulaCATAHOULA (TOP) | 3,267 | -3,156 |
| CatahoulaCATAHOULA (BASE) | 3,570 | -3,459 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,267 | 3,267 | Perforated |
| 3,267 | 3,273 | Perforated |
| 3,510 | 3,530 | Perforated |
| 3,756 | 3,757 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,668 | 13.5 | 851 S |
| 5.5 | 4,102 | 7.875 | 820 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 18, 2023 | Jun 26, 2023 | — |
| 00 | Aug 24, 2015 | Apr 28, 2015 | — |
| 00 | Jun 5, 2012 | Dec 19, 2011 | — |
| 00 | May 9, 2007 | Nov 10, 2006 | Yes |
| 00 | Dec 5, 2006 | — | — |
| 00 | Sep 28, 2006 | May 25, 2006 | Yes |
| 00 | Jun 9, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-34757 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-34757 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 13.8K
- bbl, last 12 reported months
- 734K
- bbl, all reported
- Jun 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000107184 | H-1 Injection | Active | 5,000 | 1,600 | 3,280–3,550 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 13,845 · prior 12 47,057(-71%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48134757, documented in the API reference.