WELL · 42-481-35381 · DISTRICT 3
Northington Unit 1 #1
Wharton County · Northington Lake (Wilcox) field · Vertical
Northington Unit 1 #1 (API 42-481-35381) is a plugged well in Wharton County, plugged March 19, 2019, last operated by Cico Oil & Gas Company.
The RRC has issued one drilling permit, issued May 14, 2015, permitted to 12,600 ft.
Completion filings report 9 formation tops, including Miocene (undifferentiated), Boling Dome - Disposal, Frio, Yegua.
Operator of record
Houston, TX · P-5 Y, filed Dec 6, 2019 · 227 permits on file · (713) 783-0400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cico Oil & Gas Company |
| Production reports | Cico Oil & Gas Companythrough Jun 2016 |
| Latest permit | Cico Oil & Gas CompanyMay 14, 2015 |
- 12,600
- total depth, ft
- 1
- permits on file
- May 14, 2015
- last permit issued
- Jul 1, 2015
- completed
- 0
- cumulative oil, bbl
- 47.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2015 THROUGH Mar 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 1, 2015
- Shut in
- —
- Plugged
- Mar 19, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Northington Unit 1 G-3-281668 | Northington Lake (Wilcox) | Cico Oil & Gas Company | 1 | 0 | 47.3K | Jul 2015 – Mar 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cico Oil & Gas CompanySep 2015 → Jun 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 806419-99 | Drill | Cico Oil & Gas Company | May 11, 2015 | May 14, 2015 | May 22, 2015 | 12,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-281668 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 120 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE - DISPOSAL | 950 | -830 |
| Boling Dome - Disposal | 1,660 | -1,540 |
| FrioFRIO - DISPOSAL | 1,970 | -1,850 |
| YeguaYEGUA - DISPOSAL | 2,650 | -2,530 |
| Hungerford - Disposal | 2,990 | -2,870 |
| WilcoxWILCOX - DISPOSAL | 11,500 | -11,380 |
| WilcoxWILCOX - BONUS, SW | 11,848 | -11,728 |
| AnahuacANAHUAC - DISPOSAL | — | — |
| CatahoulaCATAHOULA - DISPOSAL | — | — |
| Gretta - Disposal | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,848 | 11,852 | Perforated |
| 11,854 | 11,856 | Perforated |
| 11,858 | 11,862 | Perforated |
| 11,866 | 11,870 | Perforated |
| 11,872 | 11,876 | Perforated |
| 11,878 | 11,884 | Perforated |
| 11,887 | 11,892 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,024 | 14.75 | 1,315 S |
| 7.875 | 8,485 | 9.875 | 285 S |
| 4.5 | 12,397 | 6.75 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 25, 2017 | Dec 31, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-481-35381 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-481-35381 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48135381, documented in the API reference.