WELL · 42-483-30020 · DISTRICT 1

Treadwell #108

N

Wheeler County  · Vertical

Treadwell #108 (API 42-483-30020) is a permitted well in Wheeler County filed by Cambridge Production, Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1978 and 2003, permitted to 18,000 ft.

Completion filings report one formation top, including Woodford.

Operator of record

Cambridge Production, Inc.

Amarillo, TX · P-5 Y, filed Feb 7, 2020 · 60 permits on file · (806) 206-9408

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsCambridge Production, Inc.through Mar 2003
Latest permitCambridge Production, Inc.Jan 10, 2003
18,000
total depth, ft
2
permits on file
Jan 10, 2003
last permit issued
—
completed
0
cumulative oil, bbl
432K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Treadwell G-14-79395Gageby Creek (Hunton)Cambridge Production, Inc.10432KJan 1993 – Nov 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marsh Operating CompanyJan 1993 → Dec 1995
  2. 2Seagull Midcon Inc.Jan 1996 → May 1998
  3. 3Seagull Energy E&P Inc.Jun 1998 → Oct 2000
  4. 4Ocean Energy, Inc.Nov 2000 → Aug 2002
  5. 5Cambridge Production, Inc.Nov 2002 → Mar 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
527160-99RecompletionCambridge Production, Inc.Jan 10, 2003Jan 10, 2003—18,000
23760-99RecompletionMarsh, Tom F.May 8, 1978May 8, 1978—18,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-79395————

Formation tops

As filed on W-2/G-1. Subsea from 2,656 ft elevation.Download CSV →

FormationMD ftSubsea
Woodford15,040-12,384

Perforations

Perforated and open-hole intervals.

FromToType
15,04015,096Perforated
16,45416,540Perforated
—2,734Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,95217.251,200 S
9.62513,22512.25800 S
2.87515,2745230 S
5.517,6147.8751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 28, 2003Jan 22, 2003—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48330020, documented in the API reference.