WELL · 42-483-30703 · DISTRICT 10
Hammond #1
Wheeler County · Wheeler NW (Hunton) field · Vertical
Hammond #1 (API 42-483-30703) is a plugged well in Wheeler County, plugged April 6, 1999, last operated by Cambridge Production Inc..
The RRC has issued 2 drilling permits between 1979 and 1997, permitted to 15,000 ft.
It was permitted by Pardee Production CO. and has since transferred to Cambridge Production Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Morrow, Osage, Woodford, Hunton.
Operator of record
Permitted by Pardee Production Co.; the EWA schedule now lists a different operator.
Amarillo, TX · P-5 Y, filed Feb 7, 2020 · 60 permits on file · (806) 206-9408
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cambridge Production Inc. |
| Production reports | Cambridge Production, Inc.through Mar 1999 |
| Latest permit | Pardee Production Co.Apr 16, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,000
- total depth, ft
- 2
- permits on file
- Apr 16, 1997
- last permit issued
- Mar 20, 1980
- completed
- 0
- cumulative oil, bbl
- 134K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 20, 1980
- Shut in
- —
- Plugged
- Apr 6, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hammond G-14-89479 | Wheeler NW (Hunton) | Cambridge Production, Inc. | 1 | 0 | 119K | Jan 1993 – Jun 1999 |
| Hammond G-14-169698 | Wheeler, NW. (Woodford) | Cambridge Production, Inc. | 1 | 0 | 15K | Mar 1998 – Apr 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pardee Production Co.Jan 1993 → Jun 1997
- 2Cambridge Production, Inc.Apr 1998 → Mar 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 460663-99 | Recompletion | Pardee Production Co. | Apr 3, 1997 | Apr 16, 1997 | Feb 20, 1998 | 14,533 |
| 63018-99 | Drill | Monsanto Company | Nov 5, 1979 | Nov 5, 1979 | — | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-89479 | — | — | — | — |
| — | — G-14-169698 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,576 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,578 | 13,626 | Perforated |
| 13,948 | 13,962 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 4,475 | 12.25 | 1,900 S |
| 2.875 | 13,770 | — | — |
| 5.5 | 14,562 | 8.75 | 400 S |
| 5.5 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 28, 1998 | May 13, 1998 | Yes |
| 00 | Sep 10, 1998 | — | — |
| 00 | Jan 12, 1984 | Sep 4, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-30703 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-30703 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48330703, documented in the API reference.