WELL · 42-483-30716 · DISTRICT 10

Davidson #1039A

Plugged

Wheeler County · Mills Ranch S. (Hunton) field  · Directional

Davidson #1039A (API 42-483-30716) is a plugged well in Wheeler County, plugged May 24, 1991, last operated by Milmac Operating Company.

The RRC has issued 2 drilling permits (amended once) between 1979 and 2008, permitted to 22,000 ft.

It was permitted by Sanguine Gas Exploration, LLC and has since transferred to Milmac Operating Company on the wellbore schedule.

Completion filings report 5 formation tops, including Granite Wash, Cherokee, Atoka, Mississippian.

Operator of record

Milmac Operating Company

Permitted by Sanguine Gas Exploration, LLC; the EWA schedule now lists a different operator.

Lubbock, TX · P-5 Y, filed Jun 10, 1993

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMilmac Operating Company
Production reportsSanguine Gas Exploration, LLCthrough Apr 2026
Latest permitSanguine Gas Exploration, LLCFeb 8, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

22,000
total depth, ft
3
permits on file
Feb 8, 2008
last permit issued
Sep 20, 1988
completed
0
cumulative oil, bbl
1.91M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 20, 1988
Shut in
—
Plugged
May 24, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davidson G-14-242707Mills Ranch (Granite Wash Cons.)Sanguine Gas Exploration, LLC101.91MAug 2008 – Jul 2026
— G-14-128819——000—

Gas, mcf lease total

Last 12 months 32,352 · prior 12 37,899(-15%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sanguine Gas Exploration, LLCAug 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
654317-99ReenterSanguine Gas Exploration, LLCJan 30, 2008Feb 8, 2008Apr 24, 200816,500
67453-98DrillEnopcoJul 21, 1987Dec 21, 1979—22,000
67453-99DrillL. G. Williams Oil Co INC****P5Dec 21, 1979Dec 21, 1979Jan 8, 198022,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-128819————
—— G-14-242707————

Formation tops

As filed on W-2/G-1. Subsea from 2,095 ft elevation.Download CSV →

FormationMD ftSubsea
Granite Wash10,100-8,005
Cherokee13,798-11,703
AtokaATOKA GRANITE WASH14,528-12,433
AtokaATOKA CARBONITE WASH15,084-12,989
Mississippian18,218-16,123
Hunton19,946-17,851

Perforations

Perforated and open-hole intervals.

FromToType
12,55812,594Perforated
13,79813,874Perforated
18,21821,157Perforated
19,94621,157Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
3080040800 S
13.3755,55517.52,000 S
4.513,6988.5400 S
715,2888.5280 S
715,2888.252,150 S
9.62516,15912.251,100 S
9.62516,59912.252,200 S
3.518,487——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 5, 2009Sep 9, 2008—
00Dec 5, 2008——
00Dec 9, 1988Oct 20, 1988—
00Nov 21, 1988——
00Jan 12, 1984Sep 17, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48330716, documented in the API reference.