WELL · 42-483-31076 · DISTRICT 10
Mills Ranch #1 S
Wheeler County · Fuller (Hunton Lo.) field · Producing · Directional · Sidetrack
Mills Ranch #1 S (API 42-483-31076) is a well in Wheeler County operated by Enerquest Operating L.L.C., completed May 28, 2006 and listed as producing on the RRC schedule.
The RRC has issued 3 drilling permits between 1982 and 2006, permitted to 25,000 ft.
It was permitted by Brigham Oil & Gas, L.P. and has since transferred to Enerquest Operating L.L.C. on the wellbore schedule.
Completion filings report 6 formation tops, including Hunton Limestone, Viola, Sylvan, Connell.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Brigham Oil & Gas, L.P.; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed May 4, 2026 · 51 permits on file · (405) 760-3896
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enerquest Operating L.L.C. |
| Production reports | Enerquest Operating L.L.C.through Apr 2026 |
| Latest permit | Brigham Oil & Gas, L.P.Jan 27, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 25,000
- total depth, ft
- 3
- permits on file
- Jan 27, 2006
- last permit issued
- May 28, 2006
- completed
- 0
- cumulative oil, bbl
- 3.8M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 28, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mills G-14-115003 | Fuller (Arbuckle) | Enerquest Operating L.L.C. | 1 | 0 | 57.8K | Jan 1993 – Jul 2026 |
| Mills Ranch G-14-205899 | Fuller (Hunton, Lo.) | Enerquest Operating L.L.C. | 1 | 0 | 3.75M | Sep 2004 – Jul 2026 |
Gas, mcf lease total
Last 12 months 80,417 · prior 12 90,258(-11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Crawley Petroleum CorporationJan 1993 → Sep 1997
- 2Brigham Oil & Gas, L.P.Sep 2004 → Mar 2013
- 3Statoil Oil & Gas LPApr 2013 → Aug 2013
- 4Enerquest Operating L.L.C.Sep 2013 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 612963-99 | Recompletion | Brigham Oil & Gas, L.P. | Jan 24, 2006 | Jan 27, 2006 | Jan 28, 2006 | 23,000 |
| 541198-99 | Recompletion · sidetrack | Brigham Oil & Gas, L.P. | Jan 26, 2004 | Jan 26, 2004 | Feb 3, 2004 | 25,000 |
| 171060-99 | Drill | Harper Oil Co. | Jun 11, 1984 | Sep 7, 1982 | Sep 29, 1983 | 22,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-115003 | — | — | — | — |
| — | — G-14-205899 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,069 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 20,418 | 20,534 | Perforated |
| 20,865 | 20,990 | Perforated |
| 21,000 | 21,035 | Perforated |
| 21,068 | 21,070 | Perforated |
| 21,130 | 21,220 | Perforated |
| 21,325 | 21,329 | Perforated |
| 21,358 | 21,363 | Perforated |
| 21,405 | 21,436 | Perforated |
| 21,459 | 21,471 | Perforated |
| 21,555 | 21,574 | Perforated |
| 21,600 | 21,750 | Perforated |
| 21,762 | 21,809 | Perforated |
| 21,763 | 21,965 | Perforated |
| 22,001 | 22,074 | Perforated |
| 22,084 | 22,180 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 439 | 17.5 | 510 S |
| 9.625 | 5,183 | 12.25 | 575 S |
| 9.625 | 5,223 | 12.25 | 575 S |
| 7 | 14,880 | 8.75 | 150 S |
| 4.5 | 20,865 | 5.875 | 50 S |
| 7 | 22,732 | 8.75 | 475 S |
| 7 | 22,775 | 8.75 | 150 S |
| 3.5 | 23,518 | 5.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 14, 2008 | Aug 30, 2006 | Yes |
| 00 | May 3, 2005 | Oct 25, 2004 | Yes |
| 00 | Feb 3, 2005 | — | — |
| 00 | Mar 13, 1985 | Dec 20, 1984 | — |
| 00 | Mar 1, 1985 | Aug 6, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-31076 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-31076 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48331076, documented in the API reference.