WELL · 42-483-31117 · DISTRICT 10
Laquita #1
Wheeler County · Panhandle Wheeler County Field field · Vertical
Laquita #1 (API 42-483-31117) is a plugged well in Wheeler County, plugged June 18, 2002, last operated by Vrk Investments Inc..
The RRC has issued one drilling permit, issued March 3, 1983, permitted to 3,000 ft.
It was permitted by Wheeler Oil CO. (A) and has since transferred to Vrk Investments Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Brown Dolomite, Granite Wash, Weathered Granite.
Operator of record
Permitted by Wheeler Oil Co. (A); the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Jul 15, 1991 · 3 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | VRK Investments Inc. |
| Production reports | Questa Energy Corporationthrough Sep 1999 |
| Latest permit | Wheeler Oil Co. (A)Mar 3, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,000
- total depth, ft
- 1
- permits on file
- Mar 3, 1983
- last permit issued
- Aug 30, 1983
- completed
- 0
- cumulative oil, bbl
- 13.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 30, 1983
- Shut in
- —
- Plugged
- Jun 18, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Laquita G-14-115967 | Panhandle, East | Questa Energy Corporation | 1 | 0 | 13.7K | Jan 1993 – Jun 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Premier Energy, Inc.Jan 1993 → Apr 1996
- 2Throckmorton OperatingJun 1996 → Sep 1996
- 3Questa Energy CorporationJun 1998 → Sep 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 187534-99 | Drill | Wheeler Oil Co. (A) | Mar 3, 1983 | Mar 3, 1983 | — | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-115967 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,141 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 1,805 | 336 |
| Granite Wash | 1,990 | 151 |
| Weathered Granite | 2,050 | 91 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,879 | 1,984 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 332 | 12.25 | 200 S |
| 2.375 | 2,014 | — | — |
| 4.5 | 2,074 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 28, 1985 | Apr 8, 1985 | — |
| 00 | Apr 30, 1985 | — | — |
| 00 | Jan 12, 1984 | Sep 23, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-31117 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-31117 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48331117, documented in the API reference.