WELL · 42-483-31258 · DISTRICT 10

Britt #1026

Plugged

Wheeler County · Britt Ranch W. (Granite Wash a ) field  · Vertical

Britt #1026 (API 42-483-31258) is a plugged well in Wheeler County, plugged January 8, 2020, last operated by Unbridled Resources LLC.

The RRC has issued one drilling permit, issued September 3, 1985, permitted to 12,800 ft.

It was permitted by Haber Oil Company, Inc. and has since transferred to Unbridled Resources LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Brown Dolomite, Cottage Grove, Cherokee, Granite Wash.

Operator of record

Unbridled Resources LLC

Permitted by Haber Oil Company, Inc.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Sep 4, 2025 · 6 permits on file · (844) 507-5540

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnbridled Resources LLC
Production reportsEnervest Operating, L.L.C.through Jan 2016
Latest permitHaber Oil Company, Inc.Sep 3, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,800
total depth, ft
1
permits on file
Sep 3, 1985
last permit issued
Feb 15, 1987
completed
0
cumulative oil, bbl
889K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 15, 1987
Shut in
—
Plugged
Jan 8, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Britt G-14-121341Britt Ranch W. (Granite Wash a )Unbridled Resources, LLC10889KJan 1993 – May 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hoc Operating Co., Inc.Jan 1993 → Nov 1999
  2. 2Halex Oil CorporationDec 1999 → Oct 2000
  3. 3Parks & Luttrell Resources, LLCNov 2000 → Nov 2001
  4. 4Stallion Energy, Inc.Dec 2001 → Apr 2005
  5. 5Pogo Panhandle 2004, L.P.May 2005 → Jan 2009
  6. 6Pogo Producing Company LLCFeb 2009 → Aug 2011
  7. 7Plains Exploration & Prod. Co.Sep 2011 → Mar 2012
  8. 8Linn Operating, Inc.Apr 2012 → Dec 2014
  9. 9Enervest Operating, L.L.C.Jan 2015 → Jan 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
284229-99DrillHaber Oil Company, Inc.Apr 18, 1986Sep 3, 1985Nov 25, 198512,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-121341————

Formation tops

As filed on W-2/G-1. Subsea from 2,226 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite4,425-2,199
Cottage Grove10,245-8,019
Cherokee11,210-8,984
Granite WashGRANITE WASH A12,250-10,024

Perforations

Perforated and open-hole intervals.

FromToType
12,28412,289Perforated
12,29412,301Perforated
12,31412,340Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,41012.251,125 S
5.512,5927.875710 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 4, 1987Apr 20, 1987—
00Jul 8, 1986Jun 5, 1986—
00Jun 25, 1986Apr 10, 1986Yes
00Jun 18, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48331258, documented in the API reference.