WELL · 42-483-31283 · DISTRICT 10

Rathjen Unit #107

Plugged

Wheeler County · Britt Ranch W. (Granite Wash a ) field  · Vertical

Rathjen Unit #107 (API 42-483-31283) is a plugged well in Wheeler County, plugged September 30, 2024, last operated by Unbridled Resources LLC.

The RRC has issued one drilling permit, issued September 11, 1986, permitted to 12,800 ft.

It was permitted by Haber Oil Company, Inc. and has since transferred to Unbridled Resources LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Brown Dolomite, Cottage Grove, Cherokee.

Operator of record

Unbridled Resources LLC

Permitted by Haber Oil Company, Inc.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Sep 4, 2025 · 6 permits on file · (844) 507-5540

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnbridled Resources LLC
Production reportsUnbridled Resources, LLCthrough Sep 2024
Latest permitHaber Oil Company, Inc.Sep 11, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,800
total depth, ft
1
permits on file
Sep 11, 1986
last permit issued
Jan 27, 1987
completed
0
cumulative oil, bbl
1.13M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 27, 1987
Shut in
—
Plugged
Sep 30, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rathjen Unit G-14-123554Britt Ranch W. (Granite Wash a )Unbridled Resources, LLC101.13MJan 1993 – Nov 2024

Gas, mcf lease total

Last 12 months 0 · prior 12 3,433(-100%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hoc Operating Co., Inc.Jan 1993 → Nov 1999
  2. 2Halex Oil CorporationDec 1999 → Oct 2000
  3. 3Parks & Luttrell Resources, LLCNov 2000 → Nov 2001
  4. 4Stallion Energy, Inc.Dec 2001 → Apr 2005
  5. 5Pogo Panhandle 2004, L.P.May 2005 → Jan 2009
  6. 6Pogo Producing Company LLCFeb 2009 → Aug 2011
  7. 7Plains Exploration & Prod. Co.Sep 2011 → Mar 2012
  8. 8Linn Operating, Inc.Apr 2012 → Dec 2014
  9. 9Enervest Operating, L.L.C.Jan 2015 → Mar 2018
  10. 104P Energy Texas, LLCApr 2018 → Oct 2020
  11. 11Unbridled Resources, LLCNov 2020 → Sep 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
320503-99DrillHaber Oil Company, Inc.Aug 25, 1986Sep 11, 1986—12,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-123554————

Formation tops

As filed on W-2/G-1. Subsea from 2,376 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite4,800-2,424
Cottage Grove10,395-8,019
Cherokee11,328-8,952

Perforations

Perforated and open-hole intervals.

FromToType
12,41212,534Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,42011930 S
5.512,6217.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 27, 1987Feb 12, 1987Yes
00Mar 24, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48331283, documented in the API reference.