WELL · 42-483-31516 · DISTRICT 10
Norman #1
Wheeler County · MO-Tex (Meisner) field · Producing · Vertical
Norman #1 (API 42-483-31516) is a well in Wheeler County operated by Makar Production Company, completed January 29, 1998 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued October 22, 1997, permitted to 13,200 ft.
It was permitted by Cambridge Production, Inc. and has since transferred to Makar Production Company on the wellbore schedule.
Completion filings report 5 formation tops, including Wolfcamp, Upper Heebner Shale, Mid Missourian G.W., Woodford.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Cambridge Production, Inc.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Mar 4, 2026 · 1 permits on file · (806) 683-8283
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Makar Production Company |
| Production reports | Makar Production Companythrough Apr 2026 |
| Latest permit | Cambridge Production, Inc.Oct 22, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,200
- total depth, ft
- 1
- permits on file
- Oct 22, 1997
- last permit issued
- Jan 29, 1998
- completed
- 0
- cumulative oil, bbl
- 2.15M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 29, 1998
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Norman G-14-167798 | MO-Tex (Meisner) | Makar Production Company | 1 | 0 | 2.15M | Jan 1998 – Jul 2026 |
Gas, mcf lease total
Last 12 months 26,248 · prior 12 33,527(-22%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cambridge Production, Inc.Jan 1998 → Sep 2003
- 2Windsor Energy Group, L.L.C.Oct 2003 → Feb 2010
- 3Wynn-Crosby Operating, Ltd.Mar 2010 → Aug 2016
- 4Eagle Oil & Gas Co.Sep 2016 → Aug 2020
- 5Makar Production CompanySep 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 468953-99 | Drill | Cambridge Production, Inc. | Oct 17, 1997 | Oct 22, 1997 | Nov 20, 1997 | 13,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-167798 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,606 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,628 | 12,638 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 450 | 17.5 | 420 S |
| 8.625 | 3,524 | 10.75 | 1,950 S |
| 5.5 | 13,200 | 6.875 | 525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 16, 1998 | Feb 13, 1998 | Yes |
| 00 | May 7, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-31516 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-31516 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48331516, documented in the API reference.