WELL · 42-483-31667 · DISTRICT 10
Elmore 32 #4
Wheeler County · Allison-Britt (12350) field · Vertical
Elmore 32 #4 (API 42-483-31667) is a plugged well in Wheeler County, plugged June 27, 2014, last operated by Chesapeake Operating L.L.C..
The RRC has issued one drilling permit, issued February 4, 2004, permitted to 14,000 ft.
It was permitted by Bravo Natural Resources, Inc. and has since transferred to Chesapeake Operating L.L.C. on the wellbore schedule.
Completion filings report 2 formation tops, including Cleveland, Granite Wash.
Operator of record
Permitted by Bravo Natural Resources, Inc.; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Jul 4, 2026 · 1,645 permits on file · (405) 935-7500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating L.L.C. |
| Production reports | Chesapeake Operating, Inc.through Sep 2012 |
| Latest permit | Bravo Natural Resources, Inc.Feb 4, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 1
- permits on file
- Feb 4, 2004
- last permit issued
- Mar 26, 2004
- completed
- 0
- cumulative oil, bbl
- 1.09M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2004 THROUGH Jun 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 26, 2004
- Shut in
- —
- Plugged
- Jun 27, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Elmore 32 G-14-201516 | Allison-Britt (12350) | Chesapeake Operating, Inc. | 1 | 0 | 1.09M | Mar 2004 – Jun 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bravo Natural Resources, Inc.Mar 2004 → Sep 2004
- 2Chesapeake Operating, Inc.Oct 2004 → Sep 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 541660-99 | Drill | Bravo Natural Resources, Inc. | Feb 4, 2004 | Feb 4, 2004 | Feb 17, 2004 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-201516 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,526 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cleveland | 11,130 | -8,604 |
| Granite Wash | 11,995 | -9,469 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,092 | 12,611 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,218 | 11 | 600 S |
| 4.5 | 12,780 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 3, 2004 | Jun 1, 2004 | Yes |
| 00 | Jun 17, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-31667 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-31667 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48331667, documented in the API reference.