WELL · 42-483-32709 · DISTRICT 10
Sidney #305
Wheeler County · Stiles Ranch (Granite Wash Cons) field · Directional
Sidney #305 (API 42-483-32709) is a plugged well in Wheeler County, plugged November 1, 2018, last operated by Tapstone Energy LLC.
The RRC has issued one drilling permit (amended once), issued July 23, 2008, permitted to 18,000 ft.
It was permitted by Apache Corporation and has since transferred to Tapstone Energy LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Granite Wash, Atoka.
Operator of record
Permitted by Apache Corporation; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Aug 6, 2021 · 11 permits on file · (844) 335-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tapstone Energy LLC |
| Production reports | Tapstone Energy, LLCthrough Sep 2018 |
| Latest permit | Apache CorporationJul 23, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 18,000
- total depth, ft
- 2
- permits on file
- Jul 23, 2008
- last permit issued
- Jan 23, 2009
- completed
- 0
- cumulative oil, bbl
- 1.3M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2009 THROUGH Oct 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 23, 2009
- Shut in
- —
- Plugged
- Nov 1, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sidney G-14-248722 | Stiles Ranch (Granite Wash Cons) | Tapstone Energy, LLC | 1 | 0 | 1.3M | Jan 2009 – Oct 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Apache CorporationJan 2009 → Aug 2014
- 2Tapstone Energy, LLCApr 2015 → Sep 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 665936-98 | Drill | Apache Corporation | Jan 15, 2009 | Jul 23, 2008 | Sep 24, 2008 | 18,000 |
| 665936-99 | Drill | Apache Corporation | Jul 2, 2008 | Jul 23, 2008 | Sep 24, 2008 | 18,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-248722 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,279 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 15,066 | 16,629 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 304 | 17.5 | 305 S |
| 9.625 | 8,317 | 12.25 | 1,365 S |
| 4.5 | 16,820 | 8.75 | 1,600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 31, 2009 | Jul 10, 2009 | — |
| 00 | Jul 22, 2009 | Feb 25, 2009 | Yes |
| 00 | Jun 30, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-32709 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-32709 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48332709, documented in the API reference.