WELL · 42-483-33324 · DISTRICT 10
Smith A.C. #5H
Wheeler County · Stiles Ranch (Granite Wash Cons) field · Producing · Horizontal
Smith A.C. #5H (API 42-483-33324) is a horizontal well in Wheeler County operated by Presidio Petroleum LLC, completed February 13, 2012 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued October 13, 2011, permitted to 13,000 ft.
It was permitted by Granite Operating Company and has since transferred to Presidio Petroleum LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Anhydrite, Douglas, Brown Dolomite, Granite Wash.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Granite Operating Company; the EWA schedule now lists a different operator.
Canadian, TX · P-5 Y, filed Feb 4, 2026 · 13 permits on file · (800) 461-1604
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Presidio Petroleum LLC |
| Production reports | Presidio Petroleum LLCthrough Mar 2026 |
| Latest permit | Granite Operating CompanyOct 13, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,000
- total depth, ft
- 2
- permits on file
- Oct 13, 2011
- last permit issued
- Feb 13, 2012
- completed
- 0
- cumulative oil, bbl
- 1.82M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 13, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Smith, A.C. G-14-265669 | Stiles Ranch (Granite Wash Cons) | Presidio Petroleum LLC | 1 | 0 | 1.82M | Feb 2012 – Jul 2026 |
Gas, mcf lease total
Last 12 months 177 · prior 12 129(+37%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Granite Operating CompanyFeb 2012 → Apr 2012
- 2Apache CorporationMay 2012 → Jun 2019
- 3Presidio Petroleum LLCJul 2019 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 726124-98 | Drill | Granite Operating Company | Nov 21, 2011 | Oct 13, 2011 | Nov 17, 2011 | 13,000 |
| 726124-99 | Drill | Granite Operating Company | Oct 12, 2011 | Oct 13, 2011 | Nov 6, 2011 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-265669 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,381 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anhydrite | — | — |
| DouglasBASE DOUGLAS | — | — |
| Brown Dolomite | — | — |
| Granite Wash | — | — |
| Marmaton | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,922 | 17,188 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 484 | 17.5 | 648 S |
| 9.625 | 9,809 | 12.25 | 1,977 S |
| 5.5 | 17,239 | 8.75 | 1,552 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 3, 2013 | Mar 13, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-33324 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-33324 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48333324, documented in the API reference.