WELL · 42-483-33581 · DISTRICT 10
PC-B #1
Wheeler County · Panhandle Wheeler County Field field · Vertical
PC-B #1 (API 42-483-33581) is a well in Wheeler County operated by Aberlour Operating Inc., completed March 7, 2016.
The RRC has issued one drilling permit, issued October 26, 2012, permitted to 2,700 ft.
It was permitted by Kellerville Operating, LLC and has since transferred to Aberlour Operating Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Moore County Lime, Brown Dolomite, Granite Wash.
Its 2 leases have reported 89.9K barrels of oil and 56.5K mcf of gas since January 1993, last reporting in July 2026. The leases carry 22 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Kellerville Operating, LLC; the EWA schedule now lists a different operator.
Pampa, TX · P-5 Y, filed Feb 4, 2026 · (806) 898-4085
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Aberlour Operating Inc. |
| Production reports | Aberlour Operating Inc.through Dec 2025 |
| Latest permit | Kellerville Operating, LLCOct 26, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,700
- total depth, ft
- 1
- permits on file
- Oct 26, 2012
- last permit issued
- Mar 7, 2016
- completed
- 89.9K
- cumulative oil, bbl
- 56.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 7, 2016
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 22 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Perkins-Cullum -A- O-14-1425 | Panhandle Wheeler County Field | Aberlour Operating Inc. | 21 | 89.9K | 56.5K | Jan 1993 – Jul 2026 |
| PC-B O-14-8835 | Panhandle Wheeler County Field | Aberlour Operating Inc. | 1 | 0 | 0 | May 2013 – Aug 2016 |
Oil, barrels lease total
Last 12 months 1,839 · prior 12 3,387(-46%)
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxcel Production CompanyJan 1993 → Nov 1994
- 2Kellerville Operating, LLCDec 1994 → Apr 2010
- 3Aberlour Operating Inc.May 2010 → Dec 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 750295-99 | Drill | Kellerville Operating, LLC | Oct 23, 2012 | Oct 26, 2012 | Nov 11, 2012 | 2,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-1425 | — | — | — | — |
| — | — O-14-8835 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,398 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Moore County Lime | 1,980 | 418 |
| Brown Dolomite | 2,320 | 78 |
| Granite Wash | 2,400 | -2 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,322 | 2,330 | Perforated |
| 2,322 | 2,372 | Perforated |
| 2,332 | 2,338 | Perforated |
| 2,344 | 2,346 | Perforated |
| 2,356 | 2,372 | Perforated |
| 2,380 | 2,400 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 390 | 12.25 | 270 S |
| 7 | 2,380 | 8.75 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 7, 2016 | Mar 22, 2016 | — |
| 00 | Apr 6, 2016 | Mar 22, 2016 | — |
| 00 | Mar 31, 2014 | Dec 4, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-483-33581 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-483-33581 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48333581, documented in the API reference.