WELL · 42-485-35548 · DISTRICT 9

Henson -E- /Shallow/ #11

Plugged

Wichita County · Wichita County Regular field  · Vertical

Henson -E- /Shallow/ #11 (API 42-485-35548) is a plugged well in Wichita County, plugged November 16, 2001, last operated by Kincaid Etal Inc..

The RRC has issued one drilling permit, issued May 24, 1979, permitted to 2,000 ft.

It was permitted by Hamilton, W. B., Estate and has since transferred to Kincaid Etal Inc. on the wellbore schedule.

Completion filings report one formation top, including 1400 Sand.

Its lease has reported 12K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Kincaid Etal Inc.

Permitted by Hamilton, W. B., Estate; the EWA schedule now lists a different operator.

Holliday, TX · P-5 Y, filed Jan 5, 2026 · 6 permits on file · (940) 631-0622

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKincaid Etal Inc.
Production reportsKincaid Etal, Inc.through Apr 2026
Latest permitHamilton, W. B., EstateMay 24, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
May 24, 1979
last permit issued
Aug 30, 1979
completed
12K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 30, 1979
Shut in
—
Plugged
Nov 16, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henson -E- /Shallow/ O-13-16555Wichita County RegularKincaid Etal, Inc.912K21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 24 · prior 12 24(+0%)

012202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hamilton, W. B., EstateJan 1993 → Mar 2004
  2. 2Kincaid, JoeyApr 2004 → Mar 2005
  3. 3Kincaid Etal, Inc.Apr 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
49169-99DrillHamilton, W. B., EstateMay 24, 1979May 24, 1979—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-16555————

Formation tops

As filed on W-2/G-1. Subsea from 1,055 ft elevation.Download CSV →

FormationMD ftSubsea
1400 Sand1,413-358

Perforations

Perforated and open-hole intervals.

FromToType
1,4131,419Perforated
1,4131,434Perforated
1,4321,434Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,410——
4.51,8107.875475 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 5, 1986Jan 10, 1986—
00Jan 12, 1984Sep 10, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

14.7K
bbl, last 12 reported months
111K
bbl, all reported
May 2001
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000060373H-1 InjectionPlugged Dec 17, 20011505001,413–1,434

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 14,730 · prior 12 14,121(+4%)

05001K1.5K20002001

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48535548, documented in the API reference.