WELL · 42-485-35556 · DISTRICT 9

Miller R. J. #121

Y

Wichita County · Wichita County Regular field · Injection  · Vertical

Miller R. J. #121 (API 42-485-35556) is a well in Wichita County operated by Veneto Exploration LLC, completed May 26, 2023 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued May 28, 1979, permitted to 1,200 ft.

It was permitted by Gulf Oil Corp. and has since transferred to Veneto Exploration LLC on the wellbore schedule.

Completion filings report one formation top, including Permian (undifferentiated).

Its lease has reported 223K barrels of oil and 37 mcf of gas since January 1993, last reporting in July 2026. The lease carries 54 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Veneto Exploration LLC

Permitted by Gulf Oil Corp.; the EWA schedule now lists a different operator.

Richardson, TX · P-5 Y, filed Jun 4, 2026 · 16 permits on file · (214) 502-5177

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVeneto Exploration LLC
Production reportsVeneto Exploration, LLCthrough Apr 2026
Latest permitGulf Oil Corp.May 28, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,200
total depth, ft
1
permits on file
May 28, 1979
last permit issued
May 26, 2023
completed
223K
cumulative oil, bbl
37
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 26, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 54 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller, R. J. O-13-5155Wichita County RegularVeneto Exploration, LLC54223K37Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,420 · prior 12 1,990(-29%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Beeson Energy, Inc.Jan 1993 → Apr 2003
  2. 2Estacado Energy, LLCMay 2003 → Nov 2022
  3. 3Veneto Exploration, LLCJun 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
49595-99DrillGulf Oil Corp.May 28, 1979May 28, 1979—1,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-5155————

Formation tops

As filed on W-2/G-1. Subsea from 1,156 ft elevation.Download CSV →

FormationMD ftSubsea
Permian (undifferentiated)PERMIAN AND CISCO2,000-844

Perforations

Perforated and open-hole intervals.

FromToType
1,0381,048Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6258911.2560 S
2.3751,026——
5.51,2167.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 15, 2025Sep 13, 2022—
00Apr 22, 1985Apr 2, 1985—
00Jan 12, 1984Jul 23, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.11M
bbl, all reported
May 2012
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000054687H-1 InjectionActive3005001,038–1,048

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120112012

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48535556, documented in the API reference.