WELL · 42-485-35604 · DISTRICT 9
Foster & Allen #30
Wichita County · Wichita County Regular field · Producing · Vertical
Foster & Allen #30 (API 42-485-35604) is a well in Wichita County operated by Texas Green Energy Services LLC, completed September 16, 1979 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued July 5, 1979, permitted to 1,650 ft.
It was permitted by Thomas Production and has since transferred to Texas Green Energy Services LLC on the wellbore schedule.
Its lease has reported 44.4K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 35 wells, so these are lease totals, not this well alone.
Operator of record
Texas Green Energy Services LLC
Permitted by Thomas Production; the EWA schedule now lists a different operator.
Richmond, TX · P-5 Y, filed Mar 4, 2026 · (832) 490-6882
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texas Green Energy Services LLC |
| Production reports | Texas Green Energy Services LLCthrough Feb 2026 |
| Latest permit | Thomas ProductionJul 5, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,650
- total depth, ft
- 1
- permits on file
- Jul 5, 1979
- last permit issued
- Sep 16, 1979
- completed
- 44.4K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 16, 1979
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 35 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Foster & Allen O-13-5259 | Wichita County Regular | Texas Green Energy Services LLC | 35 | 44.4K | 21 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 121 · prior 12 226(-46%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Thomas ProductionJan 1993 → Nov 2003
- 2Alfaro & Darr, LLCDec 2003 → Dec 2015
- 3Acadia Oil, LLCJan 2016 → Aug 2022
- 4S&G Oil LLCSep 2022 → Jun 2025
- 5Texas Green Energy Services LLCJul 2025 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 52255-99 | Drill | Thomas Production | Jul 5, 1979 | Jul 5, 1979 | — | 1,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-5259 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 902 | 907 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 930 | — | — |
| 4.5 | 954 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Sep 21, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-35604 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-35604 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48535604, documented in the API reference.