WELL · 42-485-35652 · DISTRICT 9

Foster #11

Plugged

Wichita County · Wichita County Regular field  · Vertical

Foster #11 (API 42-485-35652) is a plugged well in Wichita County, plugged December 14, 2010, last operated by Haigood & Campbell.

The RRC has issued one drilling permit, issued July 20, 1979, permitted to 8,400 ft.

It was permitted by Landrum Petro CO. and has since transferred to Haigood & Campbell on the wellbore schedule.

Its lease has reported 10.4K barrels of oil and 36 mcf of gas since January 1993, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.

Operator of record

Haigood & Campbell

Permitted by Landrum Petro Co.; the EWA schedule now lists a different operator.

Archer City, TX · P-5 Y, filed Sep 8, 2023 · 20 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHaigood & Campbell
Production reportsHaigood & Campbellthrough Jul 2001
Latest permitLandrum Petro Co.Jul 20, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,400
total depth, ft
1
permits on file
Jul 20, 1979
last permit issued
Jul 25, 1979
completed
10.4K
cumulative oil, bbl
36
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 25, 1979
Shut in
—
Plugged
Dec 14, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Foster O-13-15192Wichita County RegularHaigood & Campbell1110.4K36Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Haigood & CampbellJan 1993 → Jul 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
53434-99DrillLandrum Petro Co.Jul 20, 1979Jul 20, 1979—8,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-15192————

Perforations

Perforated and open-hole intervals.

FromToType
1,7721,778Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,800——
4.51,8087.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Oct 17, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48535652, documented in the API reference.