WELL · 42-485-35824 · DISTRICT 9
Honaker #2
Wichita County · Wichita County Regular field · Vertical
Honaker #2 (API 42-485-35824) is a plugged well in Wichita County, plugged November 26, 2013, last operated by Spitfire Partners LLC.
The RRC has issued one drilling permit, issued October 5, 1979, permitted to 2,000 ft.
It was permitted by Dunith Oil CO. and has since transferred to Spitfire Partners LLC on the wellbore schedule.
Its lease has reported 867 barrels of oil and 19 mcf of gas since January 1993, last reporting in November 2014. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Dunith Oil Co.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Oct 7, 2016 · 8 permits on file · (214) 886-9898
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Spitfire Partners LLC |
| Production reports | Spitfire Partners, LLCthrough Jul 2012 |
| Latest permit | Dunith Oil Co.Oct 5, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Oct 5, 1979
- last permit issued
- Oct 29, 1979
- completed
- 867
- cumulative oil, bbl
- 19
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 29, 1979
- Shut in
- —
- Plugged
- Nov 26, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Honaker O-13-19599 | Wichita County Regular | Spitfire Partners, LLC | 4 | 867 | 19 | Jan 1993 – Nov 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mink, Jay, Oil Co.Jan 1993 → Nov 1997
- 2Swanson, Tommy Oil Co.Jan 1998 → Sep 1999
- 3Swanson, Tommy Oil Co., Inc.Oct 1999 → Mar 2002
- 4Spitfire Partners, LLCJul 2011 → Jul 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 59878-99 | Drill | Dunith Oil Co. | Oct 5, 1979 | Oct 5, 1979 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-19599 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,352 | 1,360 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 1,362 | — | — |
| — | 1,429 | 8.75 | 240 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Nov 7, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-35824 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-35824 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 95K
- bbl, all reported
- May 2014
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000040590 | W-14 Disposal | Plugged Dec 13, 2013 | 175 | 650 | 1,351–1,361 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48535824, documented in the API reference.