WELL · 42-485-36241 · DISTRICT 9
Block 2-3-15 #135
Wichita County · Wichita County Regular field · Producing · Vertical
Block 2-3-15 #135 (API 42-485-36241) is a well in Wichita County operated by Seneca Exploration LLC, completed June 6, 1980 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued March 6, 1980, permitted to 2,000 ft.
It was permitted by Dickinson, Frances Ann and has since transferred to Seneca Exploration LLC on the wellbore schedule.
Completion filings report 3 formation tops, including 800' Sand, 1200' Sand, 1800' Sand.
Its lease has reported 169K barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The lease carries 88 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Dickinson, Frances Ann; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Mar 4, 2026 · (940) 636-0307
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seneca Exploration LLC |
| Production reports | Seneca Exploration, LLCthrough Mar 2026 |
| Latest permit | Dickinson, Frances AnnMar 6, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Mar 6, 1980
- last permit issued
- Jun 6, 1980
- completed
- 169K
- cumulative oil, bbl
- 19
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 6, 1980
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 88 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Block 2-3-15 O-13-5057 | Wichita County Regular | Seneca Exploration, LLC | 88 | 169K | 19 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1,191 · prior 12 1,565(-24%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1S & J Operating Co.Jan 1993 → Aug 1993
- 2Stephens & Johnson Operating Co.Sep 1993 → May 1995
- 3DBD Operating CompanyJun 1995 → Mar 2007
- 4Moore Energy Services, LLCApr 2007 → Feb 2024
- 5Seneca Exploration, LLCMay 2024 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 74389-99 | Drill | Dickinson, Frances Ann | Mar 6, 1980 | Mar 6, 1980 | May 22, 1980 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-5057 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,161 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 800' Sand | 834 | 327 |
| 1200' Sand | 1,224 | -63 |
| 1800' Sand | 1,872 | -711 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,872 | 1,875 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 60 | 12.25 | 50 S |
| 4.5 | 1,951 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 1985 | May 28, 1985 | — |
| 00 | Jun 7, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-36241 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-36241 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48536241, documented in the API reference.